Boiler / gas / plumbing compliance — ECB/OATH summons 39133696J
Normalized ten-character lookup: 039133696J (infraction 154)
Source allegation and actual cited law
The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. Key locations/components named in the source: gas or boiler equipment.
Inspector narrative as preserved in source data
CEASE USE CROWN BOILER DUE TO REPORTED ELEVATED CO FROM FDNY, MAINTAIN BOILER; DO NOT OPERATE UNTIL ALL HAZAROUS CONDITIONS ARE IMEDIATLY CORRECTED AND DOB IS NOTIFIED TO REINSPECT 212-602-0580
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 154 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
- Issue date
- December 24, 2024
- Service date
- December 24, 2024
- Source severity
- CLASS - 1
- Source violation type
- Boilers
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $25,000.00
- Balance field in extract
- $25,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 114-33 194 Street, Queens, NY 11412
Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. Key locations/components named in the source: gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “CEASE USE CROWN BOILER DUE TO REPORTED ELEVATED CO FROM FDNY, MAINTAIN BOILER; DO NOT OPERATE UNTIL ALL HAZAROUS CONDITIONS ARE IMEDIATLY CORRECTED AND DOB…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039133696J.
- Whether a required permit, inspection or periodic filing actually applied at that time
- Whether licensed-trade repairs, test results or sign-offs already address the cited item
- Whether the exact equipment and property location match the notice
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
- Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- licensed-trade test results and equipment/permit records
- plumbing/gas/boiler permit and inspection history
- licensed contractor reports, tests and paid invoices
- equipment photographs, serials or specifications
- DOB/utility correspondence and accepted sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039133696J, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.
Request help with boiler / gas / plumbing compliance at 114-33 194 Street, Queens, NY 11412