NYC DOB / ECB / OATH hearings · verified property resolution

120 Thatford Avenue, Brooklyn, NY 11212 — Work contrary to approved plans and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 120 Thatford Avenue, Brooklyn, NY 11212 and source-listed date December 23, 2026. Recorded concerns include work contrary to approved plans, sidewalk shed / scaffolding. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work contrary to approved plansSidewalk shed / scaffolding

Verified premises, hearing and enforcement snapshot

Verified premises address
120 Thatford Avenue, Brooklyn, NY 11212
Borough
Brooklyn
BIN
3429223
BBL
3035220032
Source summonses
2
Hearing dates in source
December 23, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 120 Thatford Avenue, Brooklyn, NY 11212?

The uploaded record lists 2 summonses, including 039560488L (work contrary to approved plans), 039560485X (sidewalk shed / scaffolding). The source-listed hearing date: December 23, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560488L
039560488L
9:30 AM
CLASS - 2Work contrary to approved plansPENDING
39560485X
039560485X
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 2 recorded summonses relate at 120 Thatford Avenue, Brooklyn, NY 11212

The verified property matching links 2 distinct summonses to 120 Thatford Avenue, Brooklyn, NY 11212. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (1): source summons 039560485X. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039560488L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 13, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560488L

Normalized ten-character lookup: 039560488L (infraction 282)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED SWS AT EXP#1 INSTALLED CONTRARY TO PLANS-PARAPET PANELS INSTALLED WITH SOLID PLYWOOD -AS PER PLAN/CODE WIRE MESH PANELS TO BE INSTALLED ,SWS NOT EXTENDED 5 FEET- MISSING 2 FEET SWS DECK EXTENSION FROM

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 13, 2026
Service date
October 13, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 120 Thatford Avenue, Brooklyn, NY 11212

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “OBSERVED SWS AT EXP#1 INSTALLED CONTRARY TO PLANS-PARAPET PANELS INSTALLED WITH SOLID PLYWOOD -AS PER PLAN/CODE WIRE MESH PANELS TO BE INSTALLED ,SWS NOT E…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560488L.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560488L, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 120 Thatford Avenue, Brooklyn, NY 11212
Summons 2 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560485X

Normalized ten-character lookup: 039560485X (infraction 2P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

BC 3314.1-SUPPORTED SCAFFOLD BUILD IN UNSAFE MANNER-OBSERVED SUPPORTED SCAFFOLD AT EXP#2 APPROX.36 FEET HIGH IN USE-WORKING PLATFORMS MISSING GUARDRAIL SYSTEM,PLANKS ON PLANKS(NO SUPPORT UNDER,NO SOLID BASE-1 S

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 13, 2026
Service date
October 13, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 120 Thatford Avenue, Brooklyn, NY 11212

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3314.1-SUPPORTED SCAFFOLD BUILD IN UNSAFE MANNER-OBSERVED SUPPORTED SCAFFOLD AT EXP#2 APPROX.36 FEET HIGH IN USE-WORKING PLATFORMS MISSING GUARDRAIL SYS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560485X.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560485X, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 120 Thatford Avenue, Brooklyn, NY 11212
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 120 Thatford Avenue, Brooklyn, NY 11212 — not just the summons number

For this property, start with work contrary to approved plans and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 23, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.