1245 Broadway, Brooklyn, NY 11221 — Boiler / gas / plumbing compliance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1245 Broadway, Brooklyn, NY 11221 and source-listed date December 2, 2026. Recorded concerns include boiler / gas / plumbing compliance, certificate of correction / order noncompliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Boiler / gas / plumbing complianceCertificate of Correction / order noncompliance
Verified premises, hearing and enforcement snapshot
Verified premises address
1245 Broadway, Brooklyn, NY 11221
Borough
Brooklyn
BIN
3326376
BBL
3032930001
Source summonses
2
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 1062 through 1072 GREENE AVENUE; 1245 through 1253 BROADWAY
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1245 Broadway, Brooklyn, NY 11221?
The uploaded record lists 2 summonses, including 039200081K (boiler / gas / plumbing compliance), 039200082M (certificate of correction / order noncompliance). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 1245 Broadway, Brooklyn, NY 11221
The verified property matching links 2 distinct summonses to 1245 Broadway, Brooklyn, NY 11221. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Boiler / gas / plumbing compliance (1): source summons 039200081K. Check this charge separately, even when its documents can be gathered with other property records.
Certificate of Correction / order noncompliance (1): source summons 039200082M. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list August 11, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Boiler / gas / plumbing compliance — ECB/OATH summons 39200081K
The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. Key locations/components named in the source: gas or boiler equipment.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FOR VIOLATION #39184314P. OBSERVED AT LAUNDRY ROOM ON 2ND,3RD, AND 4TH FLOOR, THE GAS PIPING CAPS HAS BEEN REMOVED IN ALL LAUNDRY ROOMS., REPAIR AND/REPLACE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1245 Broadway, Brooklyn, NY 11221
Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. Key locations/components named in the source: gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FOR VIOLATION #39184314P. OBSERVED AT LAUNDRY ROOM ON 2ND,3RD, AND 4TH FLOOR, THE GAS PIPING CAPS HAS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200081K.
Whether a required permit, inspection or periodic filing actually applied at that time
Whether licensed-trade repairs, test results or sign-offs already address the cited item
Whether the exact equipment and property location match the notice
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed-trade test results and equipment/permit records
plumbing/gas/boiler permit and inspection history
licensed contractor reports, tests and paid invoices
equipment photographs, serials or specifications
DOB/utility correspondence and accepted sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200081K, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR VIOLATION #39184301X, FILE A CERTIFICATE OF CORRECTION
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
August 11, 2026
Service date
August 11, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1245 Broadway, Brooklyn, NY 11221
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR VIOLATION #39184301X, FILE A CERTIFICATE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200082M.
Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
Whether the prior order references the correct premises and responsible party
Whether the earlier cited condition has been corrected and what current DOB closeout record shows
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Retrieve the original violation, deadline and agency compliance requirements.
Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
underlying summons, order and deadline notice
DOB Certificate of Correction filings and acknowledgments
before/after dated photographs and signed affidavits where required
contractor or licensed-professional invoices and sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200082M, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1245 Broadway, Brooklyn, NY 11221 — not just the summons number
For this property, start with boiler / gas / plumbing compliance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Boiler / gas / plumbing compliance (1 source summons): Mechanical/plumbing violation research and licensed-trade correction coordination.
Certificate of Correction / order noncompliance (1 source summons): Underlying-case research, correction paperwork and DOB compliance closeout.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.