NYC DOB / ECB / OATH hearings · verified property resolution

125 East 29 Street, Manhattan, NY 10016 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 125 East 29 Street, Manhattan, NY 10016 and source-listed date December 17, 2026. Recorded concerns include site safety / construction operations, construction fall / overhead protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsConstruction fall / overhead protection

Verified premises, hearing and enforcement snapshot

Verified premises address
125 East 29 Street, Manhattan, NY 10016
Borough
Manhattan
BIN
1091809
BBL
1008850019
Source summonses
3
Hearing dates in source
December 17, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 125 East 29 Street, Manhattan, NY 10016?

The uploaded record lists 3 summonses, including 039560293L (construction fall / overhead protection), 039560275H (site safety / construction operations), 039560284J (site safety / construction operations). The source-listed hearing date: December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560293L
039560293L
8:30 AM
CLASS - 2Construction fall / overhead protectionPENDING
39560275H
039560275H
9:30 AM
CLASS - 1Site safety / construction operationsPENDING
39560284J
039560284J
10:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 3 recorded summonses relate at 125 East 29 Street, Manhattan, NY 10016

The verified property matching links 3 distinct summonses to 125 East 29 Street, Manhattan, NY 10016. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (2): source summons 039560275H, 039560284J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fall / overhead protection (1): source summons 039560293L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list October 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fall / overhead protection — ECB/OATH summons 39560293L

Normalized ten-character lookup: 039560293L (infraction 2P4)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data

AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE INADEQUATE ROOF PROTECTION FOR THE ADJOINING PROPERTY.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2P4
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 125 East 29 Street, Manhattan, NY 10016

Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE INADEQUATE ROOF PROTECTION FOR THE ADJOINING PROPERTY.”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560293L.

  • Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
  • Whether engineered protection drawings and installation records cover the cited area
  • Whether the cited work phase or affected neighboring area is accurately identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
  • Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • site safety plan and engineered protection details
  • dated photographs tied to the specific exposure and floor
  • guardrail, netting or overhead-cover installation and inspection records
  • contractor corrective work logs and any adjacent-property access records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560293L, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.

Request help with construction fall / overhead protection at 125 East 29 Street, Manhattan, NY 10016
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560275H

Normalized ten-character lookup: 039560275H (infraction 181)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: commercial space.

Inspector narrative as preserved in source data

AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE NO BINS TO STORE COMBUSTIBLE MATERIALS, HENCE THE CONSTRUCTION DEBRIS WERE BEING STORED IN PLASTIC BAGS AND OTHER CONTAINERS WHICH ARE FIRE HAZARDS.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 125 East 29 Street, Manhattan, NY 10016

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: commercial space. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE NO BINS TO STORE COMBUSTIBLE MATERIALS, HENCE THE CONSTRUCTION DEBRIS WERE BEING STORED IN PLASTIC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560275H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved commercial use/occupancy and relevant interior photos
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560275H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 125 East 29 Street, Manhattan, NY 10016
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560284J

Normalized ten-character lookup: 039560284J (infraction 2P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE MATERIALS.. STORED CLOSE TO THE LEADING EDGE CONTRARY TO CODE BC 3303.4.5.2

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 125 East 29 Street, Manhattan, NY 10016

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE MATERIALS.. STORED CLOSE TO THE LEADING EDGE CONTRARY TO CODE BC 3303.4.5.2”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560284J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560284J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 125 East 29 Street, Manhattan, NY 10016
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 125 East 29 Street, Manhattan, NY 10016 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 17, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.