129 East 119 Street, Manhattan, NY 10035 — Unsafe condition / maintenance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 129 East 119 Street, Manhattan, NY 10035 and source-listed date December 3, 2026. Recorded concerns include unsafe condition / maintenance, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Unsafe condition / maintenanceWork contrary to approved plans
Verified premises, hearing and enforcement snapshot
Verified premises address
129 East 119 Street, Manhattan, NY 10035
Borough
Manhattan
BIN
1054368
BBL
1017680012
Source summonses
2
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 124 through 126 EAST 120 STREET; 129 through 141 EAST 119 STREET; 1934 through 1944 LEXINGTON AVENUE
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 129 East 119 Street, Manhattan, NY 10035?
The uploaded record lists 2 summonses, including 039200399K (unsafe condition / maintenance), 039204857R (work contrary to approved plans). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 129 East 119 Street, Manhattan, NY 10035
The verified property matching links 2 distinct summonses to 129 East 119 Street, Manhattan, NY 10035. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Unsafe condition / maintenance (1): source summons 039200399K. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039204857R. Check this charge separately, even when its documents can be gathered with other property records.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: windows, apartment or dwelling unit.
Inspector narrative as preserved in source data
SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO EXTERIOR WINDOW OF APARTMENT 2H WRAPPED IN PLASTIC LIMITING FRESH AIR. BUILDING IS FIREPROOF AND SPRINKLED,, REPAIR AND/OR REPLACE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 12, 2026
Service date
August 12, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 129 East 119 Street, Manhattan, NY 10035
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: windows, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO EXTERIOR WINDOW OF APARTMENT 2H WRAPPED IN PLASTIC LIMITING FRESH AIR. BUILDING IS FIREPROOF AND SPRINKLED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200399K.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
window photographs and approved facade or window work plans
approved unit layout and relevant lawful occupancy records
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200399K, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data — potentially incomplete
ATOI OBSERVED AT APPROX. 9:50AM IN THE CELLAR, JOB HAS BEEN COMPLETED. THE WORKS DO NOT CONFORM TO THE APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS DUE TO THE POSITIONING OF THE WATER TANKS AND BO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
382 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
September 21, 2026
Service date
September 21, 2026
Source severity
CLASS - 3
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$500.00
Balance field in extract
$500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 129 East 119 Street, Manhattan, NY 10035
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED AT APPROX. 9:50AM IN THE CELLAR, JOB HAS BEEN COMPLETED. THE WORKS DO NOT CONFORM TO THE APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMEN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039204857R.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039204857R, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 129 East 119 Street, Manhattan, NY 10035 — not just the summons number
For this property, start with unsafe condition / maintenance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.