130-29 146 Street, Queens, NY 11436 — Work contrary to approved plans and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 130-29 146 Street, Queens, NY 11436 and source-listed date December 1, 2026. Recorded concerns include work contrary to approved plans, unsafe condition / maintenance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work contrary to approved plansUnsafe condition / maintenance
Verified premises, hearing and enforcement snapshot
Verified premises address
130-29 146 Street, Queens, NY 11436
Borough
Queens
BIN
4262878
BBL
4121090022
Source summonses
2
Hearing dates in source
December 1, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 130-29 146 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 130-29 146 Street, Queens, NY 11436?
The uploaded record lists 2 summonses, including 039552709X (work contrary to approved plans), 039552710N (unsafe condition / maintenance). The source-listed hearing date: December 1, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 130-29 146 Street, Queens, NY 11436
The verified property matching links 2 distinct summonses to 130-29 146 Street, Queens, NY 11436. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Unsafe condition / maintenance (1): source summons 039552710N. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039552709X. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list April 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work contrary to approved plans — ECB/OATH summons 39552709X
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit, structural framing.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF MY INSPECTION OF A TWO-STORY BUILDING BEING CONVERTED TO A TWO-FAMILY DWELLING, REVIEW OF APPROVED DRAWINGS REVEALED THAT WALLS AND STRUCTURAL COMPONENTS FROM THE CELLAR TO THE SECOND FLOOR REQUI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
April 7, 2026
Service date
April 7, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130-29 146 Street, Queens, NY 11436
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit, structural framing. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF A TWO-STORY BUILDING BEING CONVERTED TO A TWO-FAMILY DWELLING, REVIEW OF APPROVED DRAWINGS REVEALED THAT WALLS AND STRUCTUR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039552709X.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved unit layout and relevant lawful occupancy records
approved framing plans and structural engineer assessment
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039552709X, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: roof or rooftop.
Inspector narrative as preserved in source data — potentially incomplete
BC 331.4.4.12 AT THE TIME OF MY INSPECTION, ACTIVE ROOF WORK WAS IN PROGRESS. A POWER LINE WAS OBSERVED RESTING ON THE ROOF IN THE WORK AREA, CREATING A HAZARDOUS CONDITION FOR WORKERS, THE PUBLIC, AND PROPERTY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
April 7, 2026
Service date
April 7, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130-29 146 Street, Queens, NY 11436
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “BC 331.4.4.12 AT THE TIME OF MY INSPECTION, ACTIVE ROOF WORK WAS IN PROGRESS. A POWER LINE WAS OBSERVED RESTING ON THE ROOF IN THE WORK AREA, CREATING A HA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039552710N.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039552710N, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 130-29 146 Street, Queens, NY 11436 — not just the summons number
For this property, start with work contrary to approved plans and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 1, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.