130 Lafayette Street, Manhattan, NY 10013 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 130 Lafayette Street, Manhattan, NY 10013 and source-listed dates December 3, 2026, December 24, 2026. Recorded concerns include sidewalk shed / scaffolding, work contrary to approved plans, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Sidewalk shed / scaffoldingWork contrary to approved plansSite safety / construction operations
Verified premises, hearing and enforcement snapshot
Verified premises address
130 Lafayette Street, Manhattan, NY 10013
Borough
Manhattan
BIN
1091782
BBL
1002090021
Source summonses
5
Hearing dates in source
December 3, 2026, December 24, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 130 Lafayette Street, Manhattan, NY 10013?
The uploaded record lists 5 summonses, including 039559680N (sidewalk shed / scaffolding), 039559681P (site safety / construction operations), 039559679X (work contrary to approved plans), 039559682R (sidewalk shed / scaffolding) and additional tickets. The source-listed hearing dates: December 3, 2026, December 24, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 130 Lafayette Street, Manhattan, NY 10013
The verified property matching links 5 distinct summonses to 130 Lafayette Street, Manhattan, NY 10013. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Sidewalk shed / scaffolding (2): source summons 039559680N, 039559682R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Work contrary to approved plans (2): source summons 039559679X, 039207831M. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Site safety / construction operations (1): source summons 039559681P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 4 summonses list September 25, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 3, 2026, December 24, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED GARBAGE REMOVAL OPERATIONS BEING CONDUCTED IN THE STREET AND SIDEWALK WITHOUT A REQUIRED FLAG PERSON, CONTRARY TO BC 3307.4.4, FAILING TO PROVIDE TRAFFIC CONTROL AND PROTECTION D
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,400.00
Balance field in extract
$2,400.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130 Lafayette Street, Manhattan, NY 10013
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED GARBAGE REMOVAL OPERATIONS BEING CONDUCTED IN THE STREET AND SIDEWALK WITHOUT A REQUIRED FLAG PERSON, CONTRARY TO BC 3307.4…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559680N.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559680N, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED REQUIRED VERTICAL SAFETY NETTING AT MULTIPLE FLOORS AND EXPOSURES NOT PROPERLY MAINTAINED, CONTRARY TO BC 3308.5. OBSERVED LOOSE NETTING AND MISSING AND LOOSE CABLES, RESULTING I
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P2
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130 Lafayette Street, Manhattan, NY 10013
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED REQUIRED VERTICAL SAFETY NETTING AT MULTIPLE FLOORS AND EXPOSURES NOT PROPERLY MAINTAINED, CONTRARY TO BC 3308.5. OBSERVED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559681P.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559681P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: air-conditioning or mechanical equipment.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED SUSPENDED SCAFFOLD NOT INSTALLED PER APPROVED CONSTRUCTION DOCUMENTS, CONTRARY TO AC 28-105.12.2. APPROVED DRAWING REQUIRES TWO WIRE-ROPE LINES AT EACH OUTRIGGER, ONE ON THE THIM
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130 Lafayette Street, Manhattan, NY 10013
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED SUSPENDED SCAFFOLD NOT INSTALLED PER APPROVED CONSTRUCTION DOCUMENTS, CONTRARY TO AC 28-105.12.2. APPROVED DRAWING REQUIRES…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559679X.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
equipment photos and licensed installation/permit evidence
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559679X, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED AREA BELOW SUSPENDED SCAFFOLD AT SETBACK ON THE CORNER OF EXPOSURES 2 AND 3 WITHOUT OVERHEAD PROTECTION AND REQUIRED CAZ NOT MAINTAINED, CONTRARY TO BC 3301.2, CREATING FALLING-O
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130 Lafayette Street, Manhattan, NY 10013
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED AREA BELOW SUSPENDED SCAFFOLD AT SETBACK ON THE CORNER OF EXPOSURES 2 AND 3 WITHOUT OVERHEAD PROTECTION AND REQUIRED CAZ NO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559682R.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559682R, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: stairs or landings.
Inspector narrative as preserved in source data — potentially incomplete
WORK DOES NOT CONFORM TO PLANS. AT EXPOSURE 4, BETWEEN STAIRS A AND B, WALL TYPE EX-3 ON ARCH AND WALL TYPE WT-02A.1 REQUIRES R-15 CAVITY INSULATION. CONTRACTOR INSTALLED R-8 INSULATION., CONFORM WORK TO APPROV
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 14, 2026
Service date
October 14, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 130 Lafayette Street, Manhattan, NY 10013
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “WORK DOES NOT CONFORM TO PLANS. AT EXPOSURE 4, BETWEEN STAIRS A AND B, WALL TYPE EX-3 ON ARCH AND WALL TYPE WT-02A.1 REQUIRES R-15 CAVITY INSULATION. CONTR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207831M.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stair/landing measurements and dated photos or approved egress plans
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207831M, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 130 Lafayette Street, Manhattan, NY 10013 — not just the summons number
For this property, start with sidewalk shed / scaffolding and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Work contrary to approved plans (2 source summonses): Approved-plan discrepancy review and amendment/permit coordination.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 24, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.