NYC DOB / ECB / OATH hearings · verified property resolution

132 Montague Street, Brooklyn, NY 11201 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 132 Montague Street, Brooklyn, NY 11201 and source-listed date December 2, 2026. Recorded concerns include sidewalk shed / scaffolding, construction fence / site protection, certificate of correction / order noncompliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Sidewalk shed / scaffoldingConstruction fence / site protectionCertificate of Correction / order noncompliance

Verified premises, hearing and enforcement snapshot

Verified premises address
132 Montague Street, Brooklyn, NY 11201
Borough
Brooklyn
BIN
3002079
BBL
3002490027
Source summonses
4
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 132 MONTAGUE STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What is the December 2026 OATH hearing for at 132 Montague Street, Brooklyn, NY 11201?

The uploaded record lists 4 summonses, including 039559490M (sidewalk shed / scaffolding), 039559491Y (construction fence / site protection), 039559484X (certificate of correction / order noncompliance), 039559492X (sidewalk shed / scaffolding). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559490M
039559490M
8:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
39559491Y
039559491Y
9:30 AM
CLASS - 2Construction fence / site protectionPENDING
39559484X
039559484X
10:30 AM
CLASS - 2Certificate of Correction / order noncompliancePENDING
39559492X
039559492X
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 4 recorded summonses relate at 132 Montague Street, Brooklyn, NY 11201

The verified property matching links 4 distinct summonses to 132 Montague Street, Brooklyn, NY 11201. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (2): source summons 039559490M, 039559492X. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Certificate of Correction / order noncompliance (1): source summons 039559484X. Check this charge separately, even when its documents can be gathered with other property records.

Construction fence / site protection (1): source summons 039559491Y. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list September 22, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559490M

Normalized ten-character lookup: 039559490M (infraction 2P8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP#1. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMITS B01221281-I1-SH EXPIRES 05/27/2026.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2P8
Issue date
September 22, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 132 Montague Street, Brooklyn, NY 11201

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP#1. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMITS B01221281-I1-SH EXPIRES 05/27/2026.”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559490M.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559490M, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 132 Montague Street, Brooklyn, NY 11201
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39559491Y

Normalized ten-character lookup: 039559491Y (infraction 207)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXPOSURE#1. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMIT B00889157-S2-FN EXPIRES 07/22/2025

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
September 22, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 132 Montague Street, Brooklyn, NY 11201

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXPOSURE#1. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMIT B00889157-S2-FN EXPIRES 07/…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559491Y.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559491Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 132 Montague Street, Brooklyn, NY 11201
Summons 3 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39559484X

Normalized ten-character lookup: 039559484X (infraction 263)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

GC FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39523052H ISSUED 11012023. FILE CERTIFICATE OF CORRECTION.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
September 22, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 132 Montague Street, Brooklyn, NY 11201

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “GC FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39523052H ISSUED 11012023. FILE CERTIFICATE OF CO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559484X.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559484X, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 132 Montague Street, Brooklyn, NY 11201
Summons 4 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559492X

Normalized ten-character lookup: 039559492X (infraction 207)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED ON TO SIDEWALK SHED. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMIT B00711334-I1-SF EXPIRES 12/09/2023.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
September 22, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 132 Montague Street, Brooklyn, NY 11201

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED ON TO SIDEWALK SHED. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS PERMIT B00711334-I1-SF EXPIR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559492X.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559492X, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 132 Montague Street, Brooklyn, NY 11201
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 132 Montague Street, Brooklyn, NY 11201 — not just the summons number

For this property, start with sidewalk shed / scaffolding and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Certificate of Correction / order noncompliance (1 source summons): Underlying-case research, correction paperwork and DOB compliance closeout.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.