NYC DOB / ECB / OATH hearings · verified property resolution

1321 East 22 Street, Brooklyn, NY 11210 — Construction fence / site protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1321 East 22 Street, Brooklyn, NY 11210 and source-listed date December 16, 2026. Recorded concerns include construction fence / site protection, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Construction fence / site protectionStop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
1321 East 22 Street, Brooklyn, NY 11210
Borough
Brooklyn
BIN
3209232
BBL
3076400023
Source summonses
2
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1321 EAST 22 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1321 East 22 Street, Brooklyn, NY 11210?

The uploaded record lists 2 summonses, including 039197827N (construction fence / site protection), 039197933R (stop-work order / continued work). The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39197827N
039197827N
8:30 AM
CLASS - 2Construction fence / site protectionPENDING
39197933R
039197933R
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 2 recorded summonses relate at 1321 East 22 Street, Brooklyn, NY 11210

The verified property matching links 2 distinct summonses to 1321 East 22 Street, Brooklyn, NY 11210. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fence / site protection (1): source summons 039197827N. Check this charge separately, even when its documents can be gathered with other property records.

Stop-work order / continued work (1): source summons 039197933R. Check this charge separately, even when its documents can be gathered with other property records.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39197827N

Normalized ten-character lookup: 039197827N (infraction 2L1)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: rear exposure or yard, construction fence or enclosure, door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED WORK IN PROGRESS AT THE RIGHTSIDE OF PROPERTY EXP 4. NOTICED A CONSTRUCTION FENCE ERECTED WITH ACCESS DOOR TO CONCEALED THE WORK THEY ARE DOING IN THE REAR OF PROPERTY. . APPROX SIZE OF FENCE IS 1

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
Issue date
July 27, 2026
Service date
July 27, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1321 East 22 Street, Brooklyn, NY 11210

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: rear exposure or yard, construction fence or enclosure, door or exit route. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED WORK IN PROGRESS AT THE RIGHTSIDE OF PROPERTY EXP 4. NOTICED A CONSTRUCTION FENCE ERECTED WITH ACCESS DOOR TO CONCEALED THE WORK THEY ARE DOI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039197827N.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • site-fence photos, dimensions and inspection log
  • door/exit photographs and approved egress plans
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039197827N, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 1321 East 22 Street, Brooklyn, NY 11210
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39197933R

Normalized ten-character lookup: 039197933R (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: structural framing.

Inspector narrative as preserved in source data — potentially incomplete

WORK WITHOUT PERMIT: PSWO ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY, STRUCTURAL ECT WORK BEING DONE ON THE RESIDENT. ATOI OBSERVED AT EXPO # 3 A NEWLY BUILT UNPERMITTED UNDOCUMENTED ONE STORY HORIZONTAL AND

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
July 28, 2026
Service date
July 28, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1321 East 22 Street, Brooklyn, NY 11210

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT PERMIT: PSWO ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY, STRUCTURAL ECT WORK BEING DONE ON THE RESIDENT. ATOI OBSERVED AT EXPO # 3 A NEWLY…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039197933R.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039197933R, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 1321 East 22 Street, Brooklyn, NY 11210
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1321 East 22 Street, Brooklyn, NY 11210 — not just the summons number

For this property, start with construction fence / site protection and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.