135-33 114 Street, Queens, NY 11420 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 135-33 114 Street, Queens, NY 11420 and source-listed date December 3, 2026. Recorded concerns include work without a permit, site safety / construction operations, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitSite safety / construction operationsStop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
135-33 114 Street, Queens, NY 11420
Borough
Queens
BIN
4256389
BBL
4118000020
Source summonses
3
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 135-33 114 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 135-33 114 Street, Queens, NY 11420?

The uploaded record lists 3 summonses, including 039139568M (work without a permit), 039139569Y (site safety / construction operations), 039140013R (stop-work order / continued work). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39139568M
039139568M
10:30 AM
CLASS - 1Work without a permitPENDING
39139569Y
039139569Y
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39140013R
039140013R
10:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 3 recorded summonses relate at 135-33 114 Street, Queens, NY 11420

The verified property matching links 3 distinct summonses to 135-33 114 Street, Queens, NY 11420. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (1): source summons 039139569Y. Check this charge separately, even when its documents can be gathered with other property records.

Stop-work order / continued work (1): source summons 039140013R. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039139568M. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list February 25, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39139568M

Normalized ten-character lookup: 039139568M (infraction 101)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop, door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED IN THE BACK OF THE BUILDING AT EXPOSURE #3 MADE ILLEGAL EXTENSION APPROXIMATELY 8 FEET X 24 FEET X 10 FEET HIGH WITH ONE ENTRY DOOR, SHINGLE ROOF, VINYL SIDING. NO PERMIT FOR THIS ILLEGAL EXTENSION AT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
February 25, 2025
Service date
February 25, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 135-33 114 Street, Queens, NY 11420

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop, door or exit route. Record-specific inspection detail: Inspector text begins: “OBSERVED IN THE BACK OF THE BUILDING AT EXPOSURE #3 MADE ILLEGAL EXTENSION APPROXIMATELY 8 FEET X 24 FEET X 10 FEET HIGH WITH ONE ENTRY DOOR, SHINGLE ROOF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039139568M.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • door/exit photographs and approved egress plans
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039139568M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 135-33 114 Street, Queens, NY 11420
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39139569Y

Normalized ten-character lookup: 039139569Y (infraction 212)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED IN THE BACK OF THE BUILDING IN THE BACKYARD CONSTRUCTION DEBRIS PILED UP APPROXIMATELY 10 CUBIC YARDS CREATING AN UNSAFE WORKING CONDITION FOR THE CONSTRUCTION WORKERS., MAINTAIN ADEQUATE CONSTRUCTION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
Issue date
February 25, 2025
Service date
February 25, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135-33 114 Street, Queens, NY 11420

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “OBSERVED IN THE BACK OF THE BUILDING IN THE BACKYARD CONSTRUCTION DEBRIS PILED UP APPROXIMATELY 10 CUBIC YARDS CREATING AN UNSAFE WORKING CONDITION FOR THE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039139569Y.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039139569Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 135-33 114 Street, Queens, NY 11420
Summons 3 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39140013R

Normalized ten-character lookup: 039140013R (infraction 1F8)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

STOP WORK ORDER ISSUED; ACTIVE AND THE STICKER WAS POSTED ON 2/25/2025 BY INSPECTOR BADGE # 2647. STOP WORK ORDER WAS REMOVED ON 2/26/2025 AND WAS REPOSTED BY INSPECTOR BADGE# 2647. AT THE TIME OF MY INSPECTION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
February 28, 2025
Service date
February 28, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 135-33 114 Street, Queens, NY 11420

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “STOP WORK ORDER ISSUED; ACTIVE AND THE STICKER WAS POSTED ON 2/25/2025 BY INSPECTOR BADGE # 2647. STOP WORK ORDER WAS REMOVED ON 2/26/2025 AND WAS REPOSTED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039140013R.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039140013R, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 135-33 114 Street, Queens, NY 11420
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 135-33 114 Street, Queens, NY 11420 — not just the summons number

For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.