135 Reade Street, Manhattan, NY 10013 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 135 Reade Street, Manhattan, NY 10013 and source-listed date December 3, 2026. Recorded concerns include work without a permit, stop-work order / continued work, unpermitted electrical work and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitStop-work order / continued workUnpermitted electrical workUnsafe condition / maintenance

Verified premises, hearing and enforcement snapshot

Verified premises address
135 Reade Street, Manhattan, NY 10013
Borough
Manhattan
BIN
1001510
BBL
1001400029
Source summonses
6
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 135 READE STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 135 Reade Street, Manhattan, NY 10013?

The uploaded record lists 6 summonses, including 039205620N (work without a permit), 039205639N (stop-work order / continued work), 039205637J (unpermitted electrical work), 039205640K (unsafe condition / maintenance) and additional tickets. The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39205620N
039205620N
8:30 AM
CLASS - 2Work without a permitPENDING
39205639N
039205639N
8:30 AM
CLASS - 2Stop-work order / continued workPENDING
39205637J
039205637J
9:30 AM
CLASS - 1Unpermitted electrical workPENDING
39205640K
039205640K
9:30 AM
CLASS - 2Unsafe condition / maintenancePENDING
39205638L
039205638L
10:30 AM
CLASS - 2Stop-work order / continued workPENDING
39205641M
039205641M
10:30 AM
CLASS - 2Work without a permitPENDING

How the 6 recorded summonses relate at 135 Reade Street, Manhattan, NY 10013

The verified property matching links 6 distinct summonses to 135 Reade Street, Manhattan, NY 10013. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (2): source summons 039205639N, 039205638L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work without a permit (2): source summons 039205620N, 039205641M. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Unpermitted electrical work (1): source summons 039205637J. Check this charge separately, even when its documents can be gathered with other property records.

Unsafe condition / maintenance (1): source summons 039205640K. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 6 summonses list September 25, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39205620N

Normalized ten-character lookup: 039205620N (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED ROOFTOP AREA & NARROW SPACE BETWEEN 2 APTS FRAMED WITH EXTENSIVE WOODEN JOISTS (COMBUSTIBLE MATERIAL) INSTALLED OVER BLACK COMPOSITE SUPPORT PEDESTALS FOR ROOFTOP PATIO. WORK APPROX. 50% COMPLETE.

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ROOFTOP AREA & NARROW SPACE BETWEEN 2 APTS FRAMED WITH EXTENSIVE WOODEN JOISTS (COMBUSTIBLE MATERIAL) INSTALLED OVER BLACK COMPOSITE SUPPORT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205620N.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205620N, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 135 Reade Street, Manhattan, NY 10013
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39205639N

Normalized ten-character lookup: 039205639N (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: stairs or landings.

Inspector narrative as preserved in source data

ATOI OBSERVED ONGOING RENOVATION WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE. INCLUDING INSTALLATION OF NEW INTERIOR WOODEN STAIRCASE. WORK APRX 85% COMPLETE. PSWO ISSUED., OBTAIN ALL PERMITS

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ONGOING RENOVATION WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE. INCLUDING INSTALLATION OF NEW INTERIOR WOODEN STAIRCASE. WORK…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205639N.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205639N, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 135 Reade Street, Manhattan, NY 10013
Summons 3 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39205637J

Normalized ten-character lookup: 039205637J (infraction 1C9)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED ONGOING ELECTRICAL WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, INCLUDING INSTALLATION OF BREAKER BOX, LIGHTING FIXTURES, SWITCHES & OUTLETS. ALSO, 3 MULTIPLE HEADS SPLIT AC SYSTEM

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ONGOING ELECTRICAL WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, INCLUDING INSTALLATION OF BREAKER BOX, LIGHTING FIXTURES, SWI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205637J.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • equipment photos and licensed installation/permit evidence
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205637J, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 135 Reade Street, Manhattan, NY 10013
Summons 4 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39205640K

Normalized ten-character lookup: 039205640K (infraction 202)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: stairs or landings.

Inspector narrative as preserved in source data — potentially incomplete

DURING INSPECTION OF UNPERMITTED RENOVATION WORK IN ONE OF THE 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, OBSERVED MISSING TOE BOARD AT STAIRCASE RAILING, POSING FALL HAZARD. VIOLATION ISSUED., REPAIR AND/OR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “DURING INSPECTION OF UNPERMITTED RENOVATION WORK IN ONE OF THE 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, OBSERVED MISSING TOE BOARD AT STAIRCASE RAILIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205640K.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205640K, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 135 Reade Street, Manhattan, NY 10013
Summons 5 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39205638L

Normalized ten-character lookup: 039205638L (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: kitchen or bathroom.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED ONGOING PLUMBING WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, INCLUDING RENOVATION OF 2 NEW BATHROOMS & NEW KITCHEN. WORK APRX 85% COMPLETE. NO PERMIT FOUND IN DOB RECORDS. PSWO IS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ONGOING PLUMBING WORK IN ONE OF 2ND & 3RD-FLR DUPLEX APTS, READE STREET SIDE, INCLUDING RENOVATION OF 2 NEW BATHROOMS & NEW KITCHEN. WORK APR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205638L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved wet-room layouts and plumbing/alteration permits
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205638L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 135 Reade Street, Manhattan, NY 10013
Summons 6 of the source-linked property

Work without a permit — ECB/OATH summons 39205641M

Normalized ten-character lookup: 039205641M (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED CONDENSER FOR CENTRAL AC SYSTEM INSTALLED ON METAL DUNNAGES IN NARROW SPACE BETWEEN 2 SIDES OF ROOFTOP. WORK APPEARS100% COMPLETE. NO MS PERMIT IN DOB RECORDS. VIOLATION ISSUED., OBTAIN ALL PERMIT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 25, 2026
Service date
September 25, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 135 Reade Street, Manhattan, NY 10013

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED CONDENSER FOR CENTRAL AC SYSTEM INSTALLED ON METAL DUNNAGES IN NARROW SPACE BETWEEN 2 SIDES OF ROOFTOP. WORK APPEARS100% COMPLETE. NO MS PERM…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205641M.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • equipment photos and licensed installation/permit evidence
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205641M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 135 Reade Street, Manhattan, NY 10013
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 135 Reade Street, Manhattan, NY 10013 — not just the summons number

For this property, start with work without a permit and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.