140-44 Sanford Avenue, Queens, NY 11355 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 140-44 Sanford Avenue, Queens, NY 11355 and source-listed dates December 1, 2026, December 29, 2026. Recorded concerns include sidewalk shed / scaffolding, construction fence / site protection, work without a permit and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Sidewalk shed / scaffoldingConstruction fence / site protectionWork without a permitStop-work order / continued work
Verified premises, hearing and enforcement snapshot
Verified premises address
140-44 Sanford Avenue, Queens, NY 11355
Borough
Queens
BIN
4116927
BBL
4051800038
Source summonses
6
Hearing dates in source
December 1, 2026, December 29, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 140-44 SANFORD AVENUE; 140-46 SANFORD AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 140-44 Sanford Avenue, Queens, NY 11355?
The uploaded record lists 6 summonses, including 039559839X (construction fence / site protection), 039559605N (sidewalk shed / scaffolding), 039559606P (sidewalk shed / scaffolding), 039561012K (work without a permit) and additional tickets. The source-listed hearing dates: December 1, 2026, December 29, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 140-44 Sanford Avenue, Queens, NY 11355
The verified property matching links 6 distinct summonses to 140-44 Sanford Avenue, Queens, NY 11355. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Sidewalk shed / scaffolding (3): source summons 039559605N, 039559606P, 039561005M. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fence / site protection (1): source summons 039559839X. Check this charge separately, even when its documents can be gathered with other property records.
Stop-work order / continued work (1): source summons 039561008H. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039561012K. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Shared source issue date: 3 summonses list October 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.
More than one source-listed hearing date: December 1, 2026, December 29, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Construction fence / site protection — ECB/OATH summons 39559839X
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: roof or rooftop, construction fence or enclosure, door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
MISCELLANEOUS VIOLATIONS.BC 3303.3 ATOI OF 8 STORY BUILDING AT ROOF LEVEL APPROX.27,653 SQ FT SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY.UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALER
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
September 27, 2026
Service date
September 27, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: roof or rooftop, construction fence or enclosure, door or exit route. Record-specific inspection detail: Inspector text begins: “MISCELLANEOUS VIOLATIONS.BC 3303.3 ATOI OF 8 STORY BUILDING AT ROOF LEVEL APPROX.27,653 SQ FT SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY.UPON SHOU…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559839X.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
site-fence photos, dimensions and inspection log
door/exit photographs and approved egress plans
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559839X, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: roof or rooftop.
Inspector narrative as preserved in source data — potentially incomplete
BC3314.1 SUPPORTED SCAFFOLD.@8STORY NB SITE OBSERVE UNSAFE SUPPORTED SCAFFOLD UP TO ROOF LEVEL@ALL EXPOSURES CREATING FAILURE/DISLODGEMENT HAZARDS AFFECTING HEALTH&LIFE SAFETY:NOT MAINTAINED&MISSING DEBRIS NET+
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “BC3314.1 SUPPORTED SCAFFOLD.@8STORY NB SITE OBSERVE UNSAFE SUPPORTED SCAFFOLD UP TO ROOF LEVEL@ALL EXPOSURES CREATING FAILURE/DISLODGEMENT HAZARDS AFFECTIN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559605N.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559605N, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: roof or rooftop.
Inspector narrative as preserved in source data — potentially incomplete
@8STORY NB SITE IN EXTERIOR PHASE W/UNSAFE SUPPORTED SCAFFOLD UP TO ROOF LEVEL TOWERING OVER ADJOIN PROPERTY 42-08 UNION STREET WITH NO PROTECTION OF ROOF IN PLACE TO CODE BC3309.10 NOR ENGINEERED ENCLOSURE SYS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P4
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “@8STORY NB SITE IN EXTERIOR PHASE W/UNSAFE SUPPORTED SCAFFOLD UP TO ROOF LEVEL TOWERING OVER ADJOIN PROPERTY 42-08 UNION STREET WITH NO PROTECTION OF ROOF…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559606P.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559606P, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED SATURDAY 10/24/26 AFTER-HOUR VARIANCE PERMIT OBTAINED, BUT FORBADE ANY SCAFFOLD USE, EXTERIOR WORK OR WORK ABOVE 75FT. OBSERVED EXP #3 REAR YARD, WORKERS WERE ON 7-8 FLOOR SUPPORTED SCAFFOLD PERFORMING
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C2 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
Issue date
October 24, 2026
Service date
October 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “OBSERVED SATURDAY 10/24/26 AFTER-HOUR VARIANCE PERMIT OBTAINED, BUT FORBADE ANY SCAFFOLD USE, EXTERIOR WORK OR WORK ABOVE 75FT. OBSERVED EXP #3 REAR YARD…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561012K.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561012K, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
ATOI, OBSERVED WORKERS IN THE LOBBY. CALLED OUT BUT ACCESS FOR INSPECTION WAS DENIED. WORKERS THEN WENT ON 8FL SCAFFOLD ON EXP #3 AND STARTED WORKING. INSPECTION DENIED PUT SAFETY STANDARDS AT RISK FOR EVERYONE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
Issue date
October 24, 2026
Service date
October 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED WORKERS IN THE LOBBY. CALLED OUT BUT ACCESS FOR INSPECTION WAS DENIED. WORKERS THEN WENT ON 8FL SCAFFOLD ON EXP #3 AND STARTED WORKING. INSP…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561005M.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561005M, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
ATOI, I OBSERVED THAT WORK WAS CONTINUED WHILE SWO #4A52660 EXISTS HERE SINCE 09/24/26 - INDICATING NO OTHER EXTERIOR WORK ALLOWED AT EXP #3. I OBSERVED WORKERS WERE ON 7-8FL SCAFFOLD ON EXP #3, PERFORMING EXTE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
October 24, 2026
Service date
October 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 140-44 Sanford Avenue, Queens, NY 11355
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI, I OBSERVED THAT WORK WAS CONTINUED WHILE SWO #4A52660 EXISTS HERE SINCE 09/24/26 - INDICATING NO OTHER EXTERIOR WORK ALLOWED AT EXP #3. I OBSERVED WO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561008H.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561008H, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 140-44 Sanford Avenue, Queens, NY 11355 — not just the summons number
For this property, start with sidewalk shed / scaffolding and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Sidewalk shed / scaffolding (3 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 1, 2026, December 29, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.