NYC DOB / ECB / OATH hearings · verified property resolution

141 Spencer Street, Brooklyn, NY 11205 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 141 Spencer Street, Brooklyn, NY 11205 and source-listed dates December 1, 2026, December 16, 2026. Recorded concerns include stop-work order / continued work, electrical safety / service equipment. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued workElectrical safety / service equipment

Verified premises, hearing and enforcement snapshot

Verified premises address
141 Spencer Street, Brooklyn, NY 11205
Borough
Brooklyn
BIN
3048562
BBL
3017510010
Source summonses
3
Hearing dates in source
December 1, 2026, December 16, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 141 SPENCER STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 141 Spencer Street, Brooklyn, NY 11205?

The uploaded record lists 3 summonses, including 039190342N (stop-work order / continued work), 039202169Y (electrical safety / service equipment), 039202170L (stop-work order / continued work). The source-listed hearing dates: December 1, 2026, December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39190342N
039190342N
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39202169Y
039202169Y
8:30 AM
CLASS - 1Electrical safety / service equipmentPENDING
39202170L
039202170L
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 3 recorded summonses relate at 141 Spencer Street, Brooklyn, NY 11205

The verified property matching links 3 distinct summonses to 141 Spencer Street, Brooklyn, NY 11205. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (2): source summons 039190342N, 039202170L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Electrical safety / service equipment (1): source summons 039202169Y. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list August 27, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 1, 2026, December 16, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39190342N

Normalized ten-character lookup: 039190342N (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: stairs or landings, door or exit route, elevator or lift.

Inspector narrative as preserved in source data — potentially incomplete

ATOI FOR PSWO INSPECTION APPOINTMENT ON 05/19/2026, PSWO LIFT WAS DENIED FOR EXTERIOR STEEL EGRESS STAIRS AT EXPOSURE #3. DUE TO CONTINUING WORK TO 100% OF COMPLETION AGAINST A SWO. THE PLANS FAIL TO PROVIDE DE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
May 19, 2026
Service date
May 29, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 141 Spencer Street, Brooklyn, NY 11205

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: stairs or landings, door or exit route, elevator or lift. Record-specific inspection detail: Inspector text begins: “ATOI FOR PSWO INSPECTION APPOINTMENT ON 05/19/2026, PSWO LIFT WAS DENIED FOR EXTERIOR STEEL EGRESS STAIRS AT EXPOSURE #3. DUE TO CONTINUING WORK TO 100% OF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039190342N.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • door/exit photographs and approved egress plans
  • device inspection and service documentation
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039190342N, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 141 Spencer Street, Brooklyn, NY 11205
Summons 2 of the source-linked property

Electrical safety / service equipment — ECB/OATH summons 39202169Y

Normalized ten-character lookup: 039202169Y (infraction 1D2)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: electrical installation, apartment or dwelling unit.

Inspector narrative as preserved in source data

ATOI, EXPOSED ELECTRICAL PANEL WITH CABLES POWERING WELDING EQUIPMENT AND METAL SAW OBSERVED IN APT 1H, POSING POTENTIAL HAZARD. FTM ISSUED FOR UNSAFE ELECTRICAL CONDITION., COMPLY WITH EC

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
August 27, 2026
Service date
August 27, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 141 Spencer Street, Brooklyn, NY 11205

Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “ATOI, EXPOSED ELECTRICAL PANEL WITH CABLES POWERING WELDING EQUIPMENT AND METAL SAW OBSERVED IN APT 1H, POSING POTENTIAL HAZARD. FTM ISSUED FOR UNSAFE ELEC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039202169Y.

  • Whether the cited component, clearance or unsafe condition existed as described
  • Whether the equipment met the applicable requirements and was inspected/maintained
  • Whether the notice identified the correct location and owner responsibility
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
  • Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • approved unit layout and relevant lawful occupancy records
  • electrical service and panel photographs with location
  • licensed electrician safety evaluation and invoices
  • electrical permits, inspections and test reports
  • equipment specification or maintenance and repair records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039202169Y, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.

Request help with electrical safety / service equipment at 141 Spencer Street, Brooklyn, NY 11205
Summons 3 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39202170L

Normalized ten-character lookup: 039202170L (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: structural framing.

Inspector narrative as preserved in source data — potentially incomplete

SWO PARTIALLY RESCINDED ON 06/08/26, ALLOWING NON-STRUCTURAL INTERIOR WORK ONLY. ATOI OBSERVED ONGOING EXTERIOR STRUCTURAL WORK, INCLUDING INSTALLATION OF METAL JOISTS PENETRATING WALLS OF 2 BLDGS. METAL DECKIN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 27, 2026
Service date
August 27, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 141 Spencer Street, Brooklyn, NY 11205

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “SWO PARTIALLY RESCINDED ON 06/08/26, ALLOWING NON-STRUCTURAL INTERIOR WORK ONLY. ATOI OBSERVED ONGOING EXTERIOR STRUCTURAL WORK, INCLUDING INSTALLATION OF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039202170L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039202170L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 141 Spencer Street, Brooklyn, NY 11205
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 141 Spencer Street, Brooklyn, NY 11205 — not just the summons number

For this property, start with stop-work order / continued work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
  • Electrical safety / service equipment (1 source summons): Electrical maintenance summons analysis and licensed-trade remediation.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 1, 2026, December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.