143-07 45 Avenue, Queens, NY 11355 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 143-07 45 Avenue, Queens, NY 11355 and source-listed dates December 8, 2026, December 22, 2026, December 29, 2026. Recorded concerns include site safety / construction operations, sidewalk shed / scaffolding, construction fence / site protection and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsSidewalk shed / scaffoldingConstruction fence / site protectionConstruction fall / overhead protection
Verified premises, hearing and enforcement snapshot
Verified premises address
143-07 45 Avenue, Queens, NY 11355
Borough
Queens
BIN
4438166
BBL
4051950069
Source summonses
6
Hearing dates in source
December 8, 2026, December 22, 2026, December 29, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 143-07 through 143-11 45 AVENUE
Premises precision: Official building range; low endpoint shown. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: 3 default-status record(s) in the source; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 143-07 45 Avenue, Queens, NY 11355?
The uploaded record lists 6 summonses, including 039560080H (construction fence / site protection), 039560480R (site safety / construction operations), 039546519Y (site safety / construction operations), 039546739X (construction fall / overhead protection) and additional tickets. The source-listed hearing dates: December 8, 2026, December 22, 2026, December 29, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 143-07 45 Avenue, Queens, NY 11355
The verified property matching links 6 distinct summonses to 143-07 45 Avenue, Queens, NY 11355. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Sidewalk shed / scaffolding (2): source summons 039546740N, 039561022Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Site safety / construction operations (2): source summons 039560480R, 039546519Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fall / overhead protection (1): source summons 039546739X. Check this charge separately, even when its documents can be gathered with other property records.
Construction fence / site protection (1): source summons 039560080H. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list November 6, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 8, 2026, December 22, 2026, December 29, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Mixed procedural statuses: DEFAULT: 3; PENDING: 3. Confirm the present status and decision for each ticket before preparing one combined response.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Construction fence / site protection — ECB/OATH summons 39560080H
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
AT INSPECTION OF A 2-STORY BUILDING, NO ACTIVE CONSTRUCTION WORK WAS OBSERVED, HOWEVER A CONSTRUCTION FENCE WAS IN PLACE. DEPARTMENT RECORDSINDICATE FENCE PERMIT Q01245952-S2-FN EXPIRED 07/15/2026. THE EXPIRED
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 2, 2026
Service date
October 2, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “AT INSPECTION OF A 2-STORY BUILDING, NO ACTIVE CONSTRUCTION WORK WAS OBSERVED, HOWEVER A CONSTRUCTION FENCE WAS IN PLACE. DEPARTMENT RECORDSINDICATE FENCE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560080H.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560080H, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
AT TIME OF INSPECTION OBSERVED A DIESEL FUEL GENERATOR @ 1ST FLOOR WITHOUT THE REQUIRED FDNY PERMIT FOR THE USE OF THE GENERATOR. STOP ALL USE OF DIESEL FUEL GENERATOR.
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 13, 2026
Service date
October 13, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED A DIESEL FUEL GENERATOR @ 1ST FLOOR WITHOUT THE REQUIRED FDNY PERMIT FOR THE USE OF THE GENERATOR. STOP ALL USE OF DIESEL FU…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560480R.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560480R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
BC 3308.5 AT TIME OF INSPECTION OBSERVED LOOSE VERTICAL DEBRIS NETTING AT EXPOSURE 1 AND 4 THIS CREATES UNSAFE CONDITIONS TO PUBLIC AND PROPERTY BY NOT PROTECTING AGAINST FALLING OBJECTS.MAINTAIN NETTING AT ALL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
October 30, 2025
Service date
October 30, 2025
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3308.5 AT TIME OF INSPECTION OBSERVED LOOSE VERTICAL DEBRIS NETTING AT EXPOSURE 1 AND 4 THIS CREATES UNSAFE CONDITIONS TO PUBLIC AND PROPERTY BY NOT PRO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039546519Y.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039546519Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: roof or rooftop, air-conditioning or mechanical equipment.
Inspector narrative as preserved in source data — potentially incomplete
BC3309.10 ROOF PROTECTION: DURING INSPECTION OF AN ACTIVE SITE 3 STORIES HIGH, I OBSERVED THAT THERE WAS MISSING ROOF PROTECTION OVER THE HVAC UNITS ON THE ROOF AT EX#2 ALL EQUIPMENT ON THE ROOF MUST BE PROTEC
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
November 6, 2025
Service date
November 6, 2025
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: roof or rooftop, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “BC3309.10 ROOF PROTECTION: DURING INSPECTION OF AN ACTIVE SITE 3 STORIES HIGH, I OBSERVED THAT THERE WAS MISSING ROOF PROTECTION OVER THE HVAC UNITS ON THE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039546739X.
Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
Whether engineered protection drawings and installation records cover the cited area
Whether the cited work phase or affected neighboring area is accurately identified
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
equipment photos and licensed installation/permit evidence
site safety plan and engineered protection details
dated photographs tied to the specific exposure and floor
guardrail, netting or overhead-cover installation and inspection records
contractor corrective work logs and any adjacent-property access records
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039546739X, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data — potentially incomplete
BC3314.1 SCOPE SCAFFOLD: DURING INSPECTION OF AN ACTIVE SITE, I OBSERVED SUPPORTED SCAFFOLD ON THE INTERIOR AT EX#2 IN FRONT OF A INCOMPLETE CMU WALL WITH BLOCKS ON PLANKS. THE SCAFFOLD WAS MISSING GUARDRAILS,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
November 6, 2025
Service date
November 6, 2025
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “BC3314.1 SCOPE SCAFFOLD: DURING INSPECTION OF AN ACTIVE SITE, I OBSERVED SUPPORTED SCAFFOLD ON THE INTERIOR AT EX#2 IN FRONT OF A INCOMPLETE CMU WALL WITH…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039546740N.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039546740N, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.
Inspector narrative as preserved in source data
OBSERVED SIDEWALK SHED PERMIT Q00567469-I1-SH EXPIRED ON 10/15/26. SWSMISSING MAINTENANCE AND LEGAL SUPERVISION INCREASED THE RISK FOR PEDESTRIANS AND PUBLIC. , MAINTAIN SIDEWALK SHED
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 24, 2026
Service date
October 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 143-07 45 Avenue, Queens, NY 11355
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “OBSERVED SIDEWALK SHED PERMIT Q00567469-I1-SH EXPIRED ON 10/15/26. SWSMISSING MAINTENANCE AND LEGAL SUPERVISION INCREASED THE RISK FOR PEDESTRIANS AND PUBL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561022Y.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
shed permit and contractor maintenance report
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561022Y, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 143-07 45 Avenue, Queens, NY 11355 — not just the summons number
For this property, start with site safety / construction operations and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 8, 2026, December 22, 2026, December 29, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.