Unpermitted electrical work — ECB/OATH summons 39158011Z
Normalized ten-character lookup: 039158011Z (infraction 309)
Source allegation and actual cited law
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation, apartment or dwelling unit.
Inspector narrative as preserved in source data
A8: ELECTRICAL WORK WITHOUT A PERMIT. FOR THE INSTALLATION OF CENTRAL AIR SPLIT UNIT ON BUILDING. AN APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION IS NOT ON FILE., OBTAIN PERMIT; OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 309 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
- Issue date
- August 21, 2025
- Service date
- October 17, 2026
- Source severity
- CLASS - 3
- Source violation type
- Unknown
- Hearing status in extract
- ADMIT/IN-VIO
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $200.00
- Balance field in extract
- $0.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 144-11 Jewel Avenue, Queens, NY 11367
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “A8: ELECTRICAL WORK WITHOUT A PERMIT. FOR THE INSTALLATION OF CENTRAL AIR SPLIT UNIT ON BUILDING. AN APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION I…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039158011Z.
- Whether the cited work required an electrical permit at the relevant time
- Whether a licensed electrician had already filed, inspected or signed off the cited work
- Whether the described installation is correctly located and attributed
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
- If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- licensed electrician report and electrical filing history
- approved unit layout and relevant lawful occupancy records
- electrical permit/job history and inspection results
- licensed electrician invoices, test reports and sign-offs
- dated photos of panels, circuits or fixtures referenced
- approved electrical drawings and DOB correspondence
Outcome-style status in source: what to verify before acting
The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.
Need a summons-specific action plan? For 039158011Z, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with unpermitted electrical work at 144-11 Jewel Avenue, Queens, NY 11367