Stop-work order / continued work — ECB/OATH summons 39207999X
Normalized ten-character lookup: 039207999X (infraction 101)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: roof or rooftop, garage or parking area.
Inspector narrative as preserved in source data — potentially incomplete
PSWO ISSUED FOR WORK BEING DONE WITHOUT A PERMIT, ATOI OBSERVED TWO STORIES BEING BUILT, ON TO THE GARAGE WITH ROOF AND PLYWOOD, WITH 2X4 AND 2X8 RAFTERS APPROXIMATELY 35 FT HIGH, BY 20 FT IN LENGTH BY 12 FT WI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 101 — 28-105.1 WORK WITHOUT A PERMIT
- Issue date
- October 15, 2026
- Service date
- October 15, 2026
- Source severity
- CLASS - 1
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 145-44 Gar 5 Avenue, Queens, NY 11357
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: roof or rooftop, garage or parking area. Record-specific inspection detail: Inspector text begins: “PSWO ISSUED FOR WORK BEING DONE WITHOUT A PERMIT, ATOI OBSERVED TWO STORIES BEING BUILT, ON TO THE GARAGE WITH ROOF AND PLYWOOD, WITH 2X4 AND 2X8 RAFTERS A…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207999X.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- dated roof photographs and any roofing/equipment permit documents
- parking/site-plan approvals and photos of the cited use
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207999X, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Request help with stop-work order / continued work at 145-44 Gar 5 Avenue, Queens, NY 11357