145-58 19 Avenue, Queens, NY 11357 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 145-58 19 Avenue, Queens, NY 11357 and source-listed dates December 3, 2026, December 22, 2026. Recorded concerns include site safety / construction operations, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsWork without a permit
Verified premises, hearing and enforcement snapshot
Verified premises address
145-58 19 Avenue, Queens, NY 11357
Borough
Queens
BIN
4624461
BBL
4046300032
Source summonses
2
Hearing dates in source
December 3, 2026, December 22, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Official PAD aliases and building ranges: 145-58 GAR 20 AVENUE
Source identifier caveat: Different-BIN BBL candidate rejected. Check the original ticket before relying on a conflicting lot identifier.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 145-58 19 Avenue, Queens, NY 11357?
The uploaded record lists 2 summonses, including 039534718Z (site safety / construction operations), 039208018Y (work without a permit). The source-listed hearing dates: December 3, 2026, December 22, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 145-58 19 Avenue, Queens, NY 11357
The verified property matching links 2 distinct summonses to 145-58 19 Avenue, Queens, NY 11357. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Site safety / construction operations (1): source summons 039534718Z. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039208018Y. Check this charge separately, even when its documents can be gathered with other property records.
More than one source-listed hearing date: December 3, 2026, December 22, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Site safety / construction operations — ECB/OATH summons 39534718Z
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
DURING MY INSPECTION OF AN ACTIVE 2-STORY NB. I OBSERVED A WORKER WHILE LOOKING THROUGH THE VIEWING PANEL EXPOSURE 1 YARD & ASKED HIM TO LET ME IN HE WALKED AWAY & REFUSED ME ACCESS. I CALLED THE GC NUMBER NO A
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
Issue date
November 26, 2024
Service date
November 26, 2024
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 145-58 19 Avenue, Queens, NY 11357
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “DURING MY INSPECTION OF AN ACTIVE 2-STORY NB. I OBSERVED A WORKER WHILE LOOKING THROUGH THE VIEWING PANEL EXPOSURE 1 YARD & ASKED HIM TO LET ME IN HE WALKE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039534718Z.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039534718Z, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: rear exposure or yard, garage or parking area, structural framing.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, I OBSERVED A GARAGE STRUCTURE BUILT ON SITE IN REAR OF BUILDING ON LEFT SIDE. JOB # Q08049083 HAS A APPROVED APPLICATION FOR A PERMIT BUT THE PERMIT IS NOT ISSUED.
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 145-58 19 Avenue, Queens, NY 11357
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: rear exposure or yard, garage or parking area, structural framing. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, I OBSERVED A GARAGE STRUCTURE BUILT ON SITE IN REAR OF BUILDING ON LEFT SIDE. JOB # Q08049083 HAS A APPROVED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208018Y.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
parking/site-plan approvals and photos of the cited use
approved framing plans and structural engineer assessment
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208018Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 145-58 19 Avenue, Queens, NY 11357 — not just the summons number
For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 22, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.