The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 146 East 21 Street, Manhattan, NY 10010 and source-listed date December 31, 2026. Recorded concerns include site safety / construction operations, work contrary to approved plans, construction fall / overhead protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsWork contrary to approved plansConstruction fall / overhead protection

Verified premises, hearing and enforcement snapshot

Verified premises address
146 East 21 Street, Manhattan, NY 10010
Borough
Manhattan
BIN
1017956
BBL
Not provided
Source summonses
5
Hearing dates in source
December 31, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons

Source identifier caveat: OATH and CSV lot discrepancy. Check the original ticket before relying on a conflicting lot identifier.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 146 East 21 Street, Manhattan, NY 10010?

The uploaded record lists 5 summonses, including 035728253H (site safety / construction operations), 035728254J (site safety / construction operations), 039560930P (work contrary to approved plans), 039560928X (construction fall / overhead protection) and additional tickets. The source-listed hearing date: December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35728253H
035728253H
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
35728254J
035728254J
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39560930P
039560930P
8:30 AM
CLASS - 1Work contrary to approved plansPENDING
39560928X
039560928X
9:30 AM
CLASS - 1Construction fall / overhead protectionPENDING
39560929H
039560929H
10:30 AM
CLASS - 1Site safety / construction operationsPENDING

How the 5 recorded summonses relate at 146 East 21 Street, Manhattan, NY 10010

The verified property matching links 5 distinct summonses to 146 East 21 Street, Manhattan, NY 10010. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (3): source summons 035728253H, 035728254J, 039560929H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fall / overhead protection (1): source summons 039560928X. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039560930P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Shared source issue date: 3 summonses list October 22, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 35728253H

Normalized ten-character lookup: 035728253H (infraction 109)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AS NOTED: NB UNDER PERMIT #M00951038 CURRENTLY AT THE 10 FLOOR WITH CURRENT CONCRETE OPERATIONS, TO TOP OFF AT 20TH FLOOR. A WED

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 146 East 21 Street, Manhattan, NY 10010

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AS NOTED: NB UNDER PERMIT #M00951038 CURRENTLY AT THE 10 FLOOR WITH CURRE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035728253H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports
  • property-matching review notes and the original summons image to reconcile identifiers

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035728253H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 146 East 21 Street, Manhattan, NY 10010
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 35728254J

Normalized ten-character lookup: 035728254J (infraction 192)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRUCTION SITE. AS NOTED: NB UNDER PERMIT M00951038 A PROPOSED 20 STORY BUILDING CURRENTLY AT THE 10TH FLOOR AND CURRENTLY DOING CONCRETE OPERAT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 192 — BC 3301.8 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRU
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 146 East 21 Street, Manhattan, NY 10010

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRUCTION SITE. AS NOTED: NB UNDER PERMIT M00951038 A PROPOSED 20 STORY BUILDING CURRENTL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035728254J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports
  • property-matching review notes and the original summons image to reconcile identifiers

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035728254J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 146 East 21 Street, Manhattan, NY 10010
Summons 3 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560930P

Normalized ten-character lookup: 039560930P (infraction 182)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF A PROPOSED 20 STORIES BUILDING AT 17 FLOOR I OBSERVED TEMPORARY LOADING PLATFORMS INSTALLED ON THE BUILDING AT EXPOSURE #1, UPON REVIEW THE SITE SAFETY PLAN TO VERIFY COMPLIANCE INSPECT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 146 East 21 Street, Manhattan, NY 10010

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A PROPOSED 20 STORIES BUILDING AT 17 FLOOR I OBSERVED TEMPORARY LOADING PLATFORMS INSTALLED ON THE BUILDING AT EXPOSURE #1, UPON R…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560930P.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents
  • property-matching review notes and the original summons image to reconcile identifiers

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560930P, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 146 East 21 Street, Manhattan, NY 10010
Summons 4 of the source-linked property

Construction fall / overhead protection — ECB/OATH summons 39560928X

Normalized ten-character lookup: 039560928X (infraction 1P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: balcony or terrace.

Inspector narrative as preserved in source data — potentially incomplete

IN RESPONSE TO AN INCIDENT FOLLOW UP WHERE 8" WEDGE PIN FOR FORM WORK FELL ON 14TH FLOOR DURING STRIPPING OPERATION AND LANDED ON ADJACENT BUILDING 8TH FLOOR TERRACE INSPECTION REVEAL MISSING HORIZONTAL NETTING

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 146 East 21 Street, Manhattan, NY 10010

Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: balcony or terrace. Record-specific inspection detail: Inspector text begins: “IN RESPONSE TO AN INCIDENT FOLLOW UP WHERE 8" WEDGE PIN FOR FORM WORK FELL ON 14TH FLOOR DURING STRIPPING OPERATION AND LANDED ON ADJACENT BUILDING 8TH FLO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560928X.

  • Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
  • Whether engineered protection drawings and installation records cover the cited area
  • Whether the cited work phase or affected neighboring area is accurately identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
  • Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • balcony/terrace photos, waterproofing or structural records
  • site safety plan and engineered protection details
  • dated photographs tied to the specific exposure and floor
  • guardrail, netting or overhead-cover installation and inspection records
  • contractor corrective work logs and any adjacent-property access records
  • property-matching review notes and the original summons image to reconcile identifiers

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560928X, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.

Request help with construction fall / overhead protection at 146 East 21 Street, Manhattan, NY 10010
Summons 5 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560929H

Normalized ten-character lookup: 039560929H (infraction 1P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF A NEW BUILDING UNDER CONSTRUCTION I OBSERVED THE BUILDING AT 18TH FLOOR FORMING DECK AND STRIPPING OPERATION FLOOR WAS ON 14TH FLOOR INSPECTION REVEAL THAT THE STRIPPING OPERATION HAS B

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 146 East 21 Street, Manhattan, NY 10010

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A NEW BUILDING UNDER CONSTRUCTION I OBSERVED THE BUILDING AT 18TH FLOOR FORMING DECK AND STRIPPING OPERATION FLOOR WAS ON 14TH FLO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560929H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports
  • property-matching review notes and the original summons image to reconcile identifiers

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560929H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 146 East 21 Street, Manhattan, NY 10010
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 146 East 21 Street, Manhattan, NY 10010 — not just the summons number

For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
  • Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 31, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.