147-58 77 Road, Queens, NY 11367 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 147-58 77 Road, Queens, NY 11367 and source-listed date December 15, 2026. Recorded concerns include sidewalk shed / scaffolding, construction fence / site protection, construction fall / overhead protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Sidewalk shed / scaffoldingConstruction fence / site protectionConstruction fall / overhead protection
Verified premises, hearing and enforcement snapshot
Verified premises address
147-58 77 Road, Queens, NY 11367
Borough
Queens
BIN
4144681
BBL
4066880031
Source summonses
6
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 147-58 77 ROAD
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 147-58 77 Road, Queens, NY 11367?
The uploaded record lists 6 summonses, including 035730348N (sidewalk shed / scaffolding), 035730349P (construction fall / overhead protection), 035730500Z (sidewalk shed / scaffolding), 035730501K (sidewalk shed / scaffolding) and additional tickets. The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 147-58 77 Road, Queens, NY 11367
The verified property matching links 6 distinct summonses to 147-58 77 Road, Queens, NY 11367. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Sidewalk shed / scaffolding (3): source summons 035730348N, 035730500Z, 035730501K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fence / site protection (2): source summons 035730502M, 035730503Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fall / overhead protection (1): source summons 035730349P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 6 summonses list October 9, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE AND INADEQUATE SHED CONDITIONSI.E. DAMAGED/ROTTED MUDSILLS AT MULTIPLE LOCATIONS, WHICH IS NOT IN CO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,400.00
Balance field in extract
$2,400.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE AND INADEQUATE SHED CONDITIONSI.E. DAMAGED/RO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730348N.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730348N, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
MISCELLANEOUS CHAPTER 33 VIOLATIONS. NOTED AT THE TIME OF INSPECTION IT WAS OBSERVED LOOSE AND FLAPPING NETTING ON EXPOSURE 2(EAST ELEVATION), EXPOSURE 3(SOUTH ELEVATION), EXPOSURE 4(WEST ELEVATION) WHICH IS NO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “MISCELLANEOUS CHAPTER 33 VIOLATIONS. NOTED AT THE TIME OF INSPECTION IT WAS OBSERVED LOOSE AND FLAPPING NETTING ON EXPOSURE 2(EAST ELEVATION), EXPOSURE 3(S…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730349P.
Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
Whether engineered protection drawings and installation records cover the cited area
Whether the cited work phase or affected neighboring area is accurately identified
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan and engineered protection details
dated photographs tied to the specific exposure and floor
guardrail, netting or overhead-cover installation and inspection records
contractor corrective work logs and any adjacent-property access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730349P, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.
Inspector narrative as preserved in source data — potentially incomplete
EXPIRED SIDEWALK SJED PERMIT. NOTED AT TIME OF INSPECTION, I OBSERVED THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I THEN CHECKED THE BIS INTRANET AND DOB NOW RECORDS SHOW PERMIT #Q00797739-I1-SH EXPIRED ON 7/16/
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P8
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “EXPIRED SIDEWALK SJED PERMIT. NOTED AT TIME OF INSPECTION, I OBSERVED THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I THEN CHECKED THE BIS INTRANET AND DOB NO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730500Z.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
shed permit and contractor maintenance report
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730500Z, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
TEMPORARY CONSTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTED AT THETIME OF INSPECTION IT WAS OBSERVED THAT THE PERMIT FOR SUPPORT SCAFFOLD HAD EXPIRED. I CHECKED ON THE SITE AND FOUND NO PERMIT WAS DISPLAYED
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “TEMPORARY CONSTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTED AT THETIME OF INSPECTION IT WAS OBSERVED THAT THE PERMIT FOR SUPPORT SCAFFOLD HAD EXPIRED.…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730501K.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730501K, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
JOB SITE FENCE NOT CONSTRUCTED/MAINTAINED PURSUANT TO SUBSECTION. NOTED AT THE TIME OF INSPECTION IT WAS OBSERVED DEFECTIVE/INCOMPLETE CONSTRUCTION FENCE I.E. DEFECTIVE/DETERIORATED FEMCE PANELS ON MULTIPLE LOC
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “JOB SITE FENCE NOT CONSTRUCTED/MAINTAINED PURSUANT TO SUBSECTION. NOTED AT THE TIME OF INSPECTION IT WAS OBSERVED DEFECTIVE/INCOMPLETE CONSTRUCTION FENCE I…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730502M.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730502M, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
TEMPORARY CONSTRUCTION EQUIPMENT ON SITE, EXPIRED PERMIT. NOTED AT TIME OF INSPECTION, THE PERMIT FOR CONSTRUCTION FENCE HAD EXPIRED. I CHECKED ON THE SITE AND FOUND NO PERMIT WAS DISPLAYED I THEN CHECKED THE B
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 147-58 77 Road, Queens, NY 11367
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “TEMPORARY CONSTRUCTION EQUIPMENT ON SITE, EXPIRED PERMIT. NOTED AT TIME OF INSPECTION, THE PERMIT FOR CONSTRUCTION FENCE HAD EXPIRED. I CHECKED ON THE SITE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730503Y.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730503Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 147-58 77 Road, Queens, NY 11367 — not just the summons number
For this property, start with sidewalk shed / scaffolding and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Sidewalk shed / scaffolding (3 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Construction fence / site protection (2 source summonses): Site-safety violation response and fence/protection correction coordination.
Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.