1515 46 Street, Brooklyn, NY 11219 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 7 DOB/ECB/OATH summonses with 1515 46 Street, Brooklyn, NY 11219 and source-listed date December 16, 2026. Recorded concerns include site safety / construction operations, sidewalk shed / scaffolding, stop-work order / continued work and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsSidewalk shed / scaffoldingStop-work order / continued workConstruction fall / overhead protection
Verified premises, hearing and enforcement snapshot
Verified premises address
1515 46 Street, Brooklyn, NY 11219
Borough
Brooklyn
BIN
3128450
BBL
3054330072
Source summonses
7
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1515 46 Street, Brooklyn, NY 11219?
The uploaded record lists 7 summonses, including 039558152P (stop-work order / continued work), 039558167H (site safety / construction operations), 039558168J (sidewalk shed / scaffolding), 039558169L (construction fall / overhead protection) and additional tickets. The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 7 recorded summonses relate at 1515 46 Street, Brooklyn, NY 11219
The verified property matching links 7 distinct summonses to 1515 46 Street, Brooklyn, NY 11219. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Site safety / construction operations (3): source summons 039558167H, 039558170Z, 039558171K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Sidewalk shed / scaffolding (2): source summons 039558168J, 039207500H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fall / overhead protection (1): source summons 039558169L. Check this charge separately, even when its documents can be gathered with other property records.
Stop-work order / continued work (1): source summons 039558152P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 6 summonses list August 20, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Stop-work order / continued work — ECB/OATH summons 39558152P
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF MY INSPECTION, I OBSERVED BUILDING AT 6 FLOOR LEVEL, 10 WORKERS AT JOBSITE, UPON REVIEW OF DOB RECORD IT REVEAL THAT A STOP WORK ORDER IS IN PLACE FOR THE ENTER JOBSITE ON 03-16-2026 COMPLAINT #
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION, I OBSERVED BUILDING AT 6 FLOOR LEVEL, 10 WORKERS AT JOBSITE, UPON REVIEW OF DOB RECORD IT REVEAL THAT A STOP WORK ORDER IS IN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558152P.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558152P, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
BC 3301.1.2 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT THE 1ST FLOOR LEVEL ONE OXYGEN AND ACETYLENE TIED WITH ROPE AND HOSE EXTENDED TO THE TOP FLOOR, UPON REQUEST FOR FDNY PERMIT NON
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3301.1.2 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT THE 1ST FLOOR LEVEL ONE OXYGEN AND ACETYLENE TIED WITH ROPE AND HOSE EXTE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558167H.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558167H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.
Inspector narrative as preserved in source data — potentially incomplete
BC 3307.2.6 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #1 SIDEWALK SHED IN PLACE AND PEDESTRIAN WALKWAY WAS NOT MAINTAINING 5 FEET CLEAR WALKWAY UNDER THE SHED, FAILURE TO PR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “BC 3307.2.6 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #1 SIDEWALK SHED IN PLACE AND PEDESTRIAN WALKWAY WAS NOT MAINTAI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558168J.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
shed permit and contractor maintenance report
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558168J, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING AT THE 6 FLOOR LEVEL, I OBSERVED AT EXPOSURE #4 THAT THERE WERE NO OVERHEAD PROTECTION FOR ADJACENT PROPERTY, FAILURE TO PROVIDE AND MAINTAIN OVERHEAD PROT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P3
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING AT THE 6 FLOOR LEVEL, I OBSERVED AT EXPOSURE #4 THAT THERE WERE NO OVERHEAD PROTECTION FOR ADJACENT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558169L.
Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
Whether engineered protection drawings and installation records cover the cited area
Whether the cited work phase or affected neighboring area is accurately identified
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan and engineered protection details
dated photographs tied to the specific exposure and floor
guardrail, netting or overhead-cover installation and inspection records
contractor corrective work logs and any adjacent-property access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558169L, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING AT THE 6 FLOOR LEVEL, I OBSERVED AT EXPOSURE #1 A LARGE CRANE PARK ON STREET, UPON REQUEST FOR DOT PERMIT NONE WAS PRESENTED OR AT JOBSITE, FAI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING AT THE 6 FLOOR LEVEL, I OBSERVED AT EXPOSURE #1 A LARGE CRANE PARK ON STREET, UPON REQUE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558170Z.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558170Z, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #1, LARGE CRANE PARK ON STREET AND IT'S ARM HANGING OVER PARK CARS, APPROVED DRAWING REVEAL THAT NO VEHICLE SHOULD PARK UNDER CRANE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED AT EXPOSURE #1, LARGE CRANE PARK ON STREET AND IT'S ARM HANGING OVER PARK CARS, APPROVED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558171K.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558171K, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data
OBSERVED POOR HOUSEKEEPING ON THE FIRST FLOOR AND IN THE CELLAR, WITH DEBRIS AND SCAFFOLDING FRAMES STORED BENEATH THE PIPE SCAFFOLD., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1515 46 Street, Brooklyn, NY 11219
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “OBSERVED POOR HOUSEKEEPING ON THE FIRST FLOOR AND IN THE CELLAR, WITH DEBRIS AND SCAFFOLDING FRAMES STORED BENEATH THE PIPE SCAFFOLD., MAINTAIN ADEQUATE CO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207500H.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207500H, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1515 46 Street, Brooklyn, NY 11219 — not just the summons number
For this property, start with site safety / construction operations and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.