NYC DOB / ECB / OATH hearings · verified property resolution

152 West 36 Street, Manhattan, NY 10018 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 7 DOB/ECB/OATH summonses with 152 West 36 Street, Manhattan, NY 10018 and source-listed date December 17, 2026. Recorded concerns include sidewalk shed / scaffolding, work contrary to approved plans, fire escape / exit obstruction and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Sidewalk shed / scaffoldingWork contrary to approved plansFire escape / exit obstructionSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
152 West 36 Street, Manhattan, NY 10018
Borough
Manhattan
BIN
1015233
BBL
1008110062
Source summonses
7
Hearing dates in source
December 17, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 152 through 156 WEST 36 STREET

Premises precision: Official building range; low endpoint shown. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 152 West 36 Street, Manhattan, NY 10018?

The uploaded record lists 7 summonses, including 039560317R (sidewalk shed / scaffolding), 039560321J (work contrary to approved plans), 039560319K (sidewalk shed / scaffolding), 039560322L (fire escape / exit obstruction) and additional tickets. The source-listed hearing date: December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560317R
039560317R
8:30 AM
CLASS - 1Sidewalk shed / scaffoldingPENDING
39560321J
039560321J
8:30 AM
CLASS - 2Work contrary to approved plansPENDING
39560319K
039560319K
9:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
39560322L
039560322L
9:30 AM
CLASS - 2Fire escape / exit obstructionPENDING
39560315N
039560315N
10:30 AM
CLASS - 1Site safety / construction operationsPENDING
39560316P
039560316P
10:30 AM
CLASS - 2Work contrary to approved plansPENDING
39560320H
039560320H
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 7 recorded summonses relate at 152 West 36 Street, Manhattan, NY 10018

The verified property matching links 7 distinct summonses to 152 West 36 Street, Manhattan, NY 10018. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (3): source summons 039560317R, 039560319K, 039560320H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work contrary to approved plans (2): source summons 039560321J, 039560316P. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Fire escape / exit obstruction (1): source summons 039560322L. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039560315N. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 7 summonses list October 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560317R

Normalized ten-character lookup: 039560317R (infraction 1F2)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALT1 ACTIVE SITE,OBSERVED SUPPORTED SCAFFOLDING 245 FT ATTACHED TO SHORING ON PERSONNEL HOIST RUN AT EXP#1, ON TOP OF SIDEWALK SHED DECK AT EXP#1.UPON REQUEST TO CONTRACTOR FOR LOADS IMPOSED LETTER STA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 1
Source violation type
Site Safety
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “16 STORY ALT1 ACTIVE SITE,OBSERVED SUPPORTED SCAFFOLDING 245 FT ATTACHED TO SHORING ON PERSONNEL HOIST RUN AT EXP#1, ON TOP OF SIDEWALK SHED DECK AT EXP#1.…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560317R.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560317R, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 152 West 36 Street, Manhattan, NY 10018
Summons 2 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560321J

Normalized ten-character lookup: 039560321J (infraction 282)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALT ACTIVE SITE, OBSERVED SIDEWALK SHED IN PLACE AT EXP#1 INSTALLED CONTRARY TO PLANS.RED SCAFFOLDING ATTACHED TO HOIST RUN ON TOP OF SHED DECK. BENT 4' HORIZONTAL MEMBERS/BRACING AT EXP#1,2,AT EX#1,4

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “16 STORY ALT ACTIVE SITE, OBSERVED SIDEWALK SHED IN PLACE AT EXP#1 INSTALLED CONTRARY TO PLANS.RED SCAFFOLDING ATTACHED TO HOIST RUN ON TOP OF SHED DECK. B…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560321J.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560321J, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 152 West 36 Street, Manhattan, NY 10018
Summons 3 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560319K

Normalized ten-character lookup: 039560319K (infraction 2F7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD INSTALLED AT ROOF EXP#2/9 FL SETBACK EXP#3 & ON 11 FLOOR SETBACK AT EXP#1. UPON REQUEST TO CONTRACTOR FOR APPROVED PLANS AND OR A CD-5 STAMPED BY DOB

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “16 STORY ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD INSTALLED AT ROOF EXP#2/9 FL SETBACK EXP#3 & ON 11 FLOOR SETBACK AT EXP#1. UPON REQUEST TO CON…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560319K.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560319K, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 152 West 36 Street, Manhattan, NY 10018
Summons 4 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39560322L

Normalized ten-character lookup: 039560322L (infraction 2P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALT1 ACTIVE SITE, OBSERVED EGRESS/INGRESS STAIRWAY PARTIALLY BLOCKED/OBSTRUCTED BY HOIST RUN SHORING ON 9 FL AT EXP#4. CREATING AN UNSAFE CONDITION/FIRE HAZARD TO WORKER'S ,VISITOR & FIRST RESPONDERS O

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “16 STORY ALT1 ACTIVE SITE, OBSERVED EGRESS/INGRESS STAIRWAY PARTIALLY BLOCKED/OBSTRUCTED BY HOIST RUN SHORING ON 9 FL AT EXP#4. CREATING AN UNSAFE CONDITIO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560322L.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560322L, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 152 West 36 Street, Manhattan, NY 10018
Summons 5 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560315N

Normalized ten-character lookup: 039560315N (infraction 115)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALT1 ACTIVE JOBSITE,ON 10 FL AT EXP#4 SHAFT OPENING APPROXIMATELY 3 FT WIDE OPENING/100 FT DOWN TO 1 FL WHERE WORKER'S WERE INSTALLING CMU BLOCK FRESH WET CEMENT. OBSERVED MISSING FALL PROTECTION/GUARD

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “16 STORY ALT1 ACTIVE JOBSITE,ON 10 FL AT EXP#4 SHAFT OPENING APPROXIMATELY 3 FT WIDE OPENING/100 FT DOWN TO 1 FL WHERE WORKER'S WERE INSTALLING CMU BLOCK F…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560315N.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560315N, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 152 West 36 Street, Manhattan, NY 10018
Summons 6 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560316P

Normalized ten-character lookup: 039560316P (infraction 282)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALT1 ACTIVE SITE, WORK CONTRARY TO SITE SAFETY PLAN/SSP. OBSERVED AT EXP#2,4/INADEQUATE PROTECTION OF ADJOINING PROPERTY.MISSING PLANKING ON TOP OF SCAFFOLD FOR MECHANICAL PROTECTION 3309.10/3309.13/33

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “16 STORY ALT1 ACTIVE SITE, WORK CONTRARY TO SITE SAFETY PLAN/SSP. OBSERVED AT EXP#2,4/INADEQUATE PROTECTION OF ADJOINING PROPERTY.MISSING PLANKING ON TOP O…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560316P.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560316P, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 152 West 36 Street, Manhattan, NY 10018
Summons 7 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560320H

Normalized ten-character lookup: 039560320H (infraction 261)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

16 STORY ALTERATION ACTIVE SITE, OBSERVED SUSPENDED SCAFFOLD INSTALLED ON ROOF AT EXP#2 & AT SETBACK ON 9 FLOOR EXP#3 AND ON 11 FL EXP#1 IN PLACE. UNDER PERMIT#M01388029, UPON REQUEST TO CONTRACTOR ONSITE FOR S

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Cranes and Derricks
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 152 West 36 Street, Manhattan, NY 10018

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “16 STORY ALTERATION ACTIVE SITE, OBSERVED SUSPENDED SCAFFOLD INSTALLED ON ROOF AT EXP#2 & AT SETBACK ON 9 FLOOR EXP#3 AND ON 11 FL EXP#1 IN PLACE. UNDER PE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560320H.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560320H, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 152 West 36 Street, Manhattan, NY 10018
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 152 West 36 Street, Manhattan, NY 10018 — not just the summons number

For this property, start with sidewalk shed / scaffolding and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Sidewalk shed / scaffolding (3 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Work contrary to approved plans (2 source summonses): Approved-plan discrepancy review and amendment/permit coordination.
  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 17, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.