153-33 Hillside Avenue, Queens, NY 11432 — Construction fence / site protection and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 153-33 Hillside Avenue, Queens, NY 11432 and source-listed date December 15, 2026. Recorded concerns include construction fence / site protection, work without a permit, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Construction fence / site protectionWork without a permitWork contrary to approved plans
Verified premises, hearing and enforcement snapshot
Verified premises address
153-33 Hillside Avenue, Queens, NY 11432
Borough
Queens
BIN
4207478
BBL
4097060052
Source summonses
3
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 153-33 through 153-41 HILLSIDE AVENUE; 87-52A PARSONS BOULEVARD; 87-54 through 87-56 PARSONS BOULEVARD
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 153-33 Hillside Avenue, Queens, NY 11432?
The uploaded record lists 3 summonses, including 039560431K (construction fence / site protection), 039560423K (work without a permit), 039560430Z (work contrary to approved plans). The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 153-33 Hillside Avenue, Queens, NY 11432
The verified property matching links 3 distinct summonses to 153-33 Hillside Avenue, Queens, NY 11432. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Construction fence / site protection (1): source summons 039560431K. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039560430Z. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039560423K. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list September 9, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Permits and approved drawings may be common evidence, but an absent permit and departure from approved documents are different allegations.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Construction fence / site protection — ECB/OATH summons 39560431K
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.
Inspector narrative as preserved in source data
OBSERVED SITE CLOSED FENCE ERECTED ON EXP 2 UPON REVIEW BIS AND DOB NOW NOTED NO PERMIT HAS BEEN ISSUED . CONTRARY TO BUILDING CODE . STOPALL WORK UNDER PERMIT Q01463054
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
Issue date
September 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 153-33 Hillside Avenue, Queens, NY 11432
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “OBSERVED SITE CLOSED FENCE ERECTED ON EXP 2 UPON REVIEW BIS AND DOB NOW NOTED NO PERMIT HAS BEEN ISSUED . CONTRARY TO BUILDING CODE . STOPALL WORK UNDER PE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560431K.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560431K, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED: FACADE PARAPET WORK IN PROGRESS AT EXP #1,#2,& #4 ., UPON RESEARCH ON DOB NOW AND BIS NO PREMIT WAS ISSUE, ALL WORK ARE PERFORMING WITHOUT SPECIFIC PERMIT . STOP ALL EXTERIOR FACADE WORK IMMEDIATELY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 153-33 Hillside Avenue, Queens, NY 11432
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “OBSERVED: FACADE PARAPET WORK IN PROGRESS AT EXP #1,#2,& #4 ., UPON RESEARCH ON DOB NOW AND BIS NO PREMIT WAS ISSUE, ALL WORK ARE PERFORMING WITHOUT SPECIF…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560423K.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
photographs by elevation and facade professional repair reports
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560423K, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data
NOTED: SWS ERECTED ON EXP 1,4 CONTRARY TO APPROVED DRAWINGS NOT EXTENDED AT EXP 4,& MISSING LIGHTS UNDER IT STOP ALL WORK UNDER PERMIT Q01336624/ STOP ALL WORK UNDER JOB Q01336624
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
September 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 153-33 Hillside Avenue, Queens, NY 11432
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “NOTED: SWS ERECTED ON EXP 1,4 CONTRARY TO APPROVED DRAWINGS NOT EXTENDED AT EXP 4,& MISSING LIGHTS UNDER IT STOP ALL WORK UNDER PERMIT Q01336624/ STOP ALL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560430Z.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560430Z, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 153-33 Hillside Avenue, Queens, NY 11432 — not just the summons number
For this property, start with construction fence / site protection and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.