NYC DOB / ECB / OATH hearings · verified property resolution

157 Leonard Street, Brooklyn, NY 11206 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 157 Leonard Street, Brooklyn, NY 11206 and source-listed date December 23, 2026. Recorded concerns include site safety / construction operations, work contrary to approved plans, jobsite fire extinguishers and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsWork contrary to approved plansJobsite fire extinguishersConstruction fence / site protection

Verified premises, hearing and enforcement snapshot

Verified premises address
157 Leonard Street, Brooklyn, NY 11206
Borough
Brooklyn
BIN
3430359
BBL
3030320018
Source summonses
6
Hearing dates in source
December 23, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 157 Leonard Street, Brooklyn, NY 11206?

The uploaded record lists 6 summonses, including 039560754P (site safety / construction operations), 039560764Z (site safety / construction operations), 039560752L (work contrary to approved plans), 039560755R (site safety / construction operations) and additional tickets. The source-listed hearing date: December 23, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560754P
039560754P
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39560764Z
039560764Z
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39560752L
039560752L
9:30 AM
CLASS - 2Work contrary to approved plansPENDING
39560755R
039560755R
9:30 AM
CLASS - 2Site safety / construction operationsPENDING
39560765K
039560765K
9:30 AM
CLASS - 2Jobsite fire extinguishersPENDING
39560753N
039560753N
10:30 AM
CLASS - 2Construction fence / site protectionPENDING

How the 6 recorded summonses relate at 157 Leonard Street, Brooklyn, NY 11206

The verified property matching links 6 distinct summonses to 157 Leonard Street, Brooklyn, NY 11206. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (3): source summons 039560754P, 039560764Z, 039560755R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fence / site protection (1): source summons 039560753N. Check this charge separately, even when its documents can be gathered with other property records.

Jobsite fire extinguishers (1): source summons 039560765K. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039560752L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 6 summonses list October 19, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560754P

Normalized ten-character lookup: 039560754P (infraction 115)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: cellar or basement area.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION I OBSERVED 2 STAIRWAYS GOING FROM 1ST FL TO CELLAR ON EXTERIOR AT EXP#1 APPROX. 10-12 FEET DEEP-NO GUARDRAIL SYSTEM PROVIDED AS REQUIRED-STOP ALL WORK 10 FEET FROM EXTERIOR STAIRWAY

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED 2 STAIRWAYS GOING FROM 1ST FL TO CELLAR ON EXTERIOR AT EXP#1 APPROX. 10-12 FEET DEEP-NO GUARDRAIL SYSTEM PROVIDED A…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560754P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560754P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 157 Leonard Street, Brooklyn, NY 11206
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560764Z

Normalized ten-character lookup: 039560764Z (infraction 212)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

AT THE TIME OF MY INSPECTION I OBSERVED INADEQUATE HOUSEKEEPING THROUGH OUT WHOLE SITE-CARDBOARDS , MATERIAL, GARBAGE SCATTERED ALL OVER FLOORS ON EVERY WORKING LEVEL(FLOOR)

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED INADEQUATE HOUSEKEEPING THROUGH OUT WHOLE SITE-CARDBOARDS , MATERIAL, GARBAGE SCATTERED ALL OVER FLOORS ON EVERY WO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560764Z.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560764Z, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 157 Leonard Street, Brooklyn, NY 11206
Summons 3 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560752L

Normalized ten-character lookup: 039560752L (infraction 282)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

WORK CONTRARY TO SSP-AT THE TIME OF MY INSPECTION OBSERVED SWS REMOVEDFROM SITE WHILE WORK NOT COMPLETE ON ROOF/SETBACKS,SSP DOES NOT PROVIDE PHASE OF SIDEWALK WORK WITH MEANS AND METHODS OF PEDESTRIAN PROTECTI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “WORK CONTRARY TO SSP-AT THE TIME OF MY INSPECTION OBSERVED SWS REMOVEDFROM SITE WHILE WORK NOT COMPLETE ON ROOF/SETBACKS,SSP DOES NOT PROVIDE PHASE OF SIDE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560752L.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560752L, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 157 Leonard Street, Brooklyn, NY 11206
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560755R

Normalized ten-character lookup: 039560755R (infraction 2F7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION I OBSERVED WORKERS PERFORMING WORK ON EXTERIOR SIDEWALK-UPON ASKING COMPETENT PERSON FOR ORIENTATION PROVIDED FOR WORKERS-NONE WERE DONE AS PER COMPETENT PERSON/LOG BOOK-UPON ASKING

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED WORKERS PERFORMING WORK ON EXTERIOR SIDEWALK-UPON ASKING COMPETENT PERSON FOR ORIENTATION PROVIDED FOR WORKERS-NONE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560755R.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560755R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 157 Leonard Street, Brooklyn, NY 11206
Summons 5 of the source-linked property

Jobsite fire extinguishers — ECB/OATH summons 39560765K

Normalized ten-character lookup: 039560765K (infraction 2N6)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The inspector alleges absent, expired, inaccessible or otherwise deficient portable fire extinguishers at a construction site. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data

AT THE TIME OF MY INSPECTION I OBSERVED ALL FIRE EXTINGUISHERS ON EVERY FLOOR USED AS DOOR STOPERS ,AS PER FIRE CODES-906.7 AND 906.9 FIRE EXTINGUISHER SHALL BE HANGING ON HANGER AT LEAST 4 INCHES FROM FLOOR

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2N6
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$625.00
Balance field in extract
$625.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Check the actual site locations, number, condition, inspection tags and accessibility of extinguishers on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED ALL FIRE EXTINGUISHERS ON EVERY FLOOR USED AS DOOR STOPERS ,AS PER FIRE CODES-906.7 AND 906.9 FIRE EXTINGUISHER SHA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560765K.

  • Whether the cited extinguishers were present and properly inspected at the time alleged
  • Whether the inspector identified the correct site or phase of work
  • Whether contemporaneous extinguisher service or inspection records document compliance
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Supply, inspect or replace required fire extinguishers promptly and maintain accessible placement.
  • Retain service tags, logs and dated post-correction photos; verify whether formal DOB certification or OATH hearing response is required.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • dated extinguisher location photographs and inspection tags
  • service vendor logs, receipts and replacement invoices
  • site fire-protection plan and daily inspection records
  • original summons and photos attached by inspector

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560765K, Building Violation LLC can scope site fire-extinguisher compliance research and hearing-evidence coordination after reviewing the actual notice and current DOB/OATH record.

Request help with jobsite fire extinguishers at 157 Leonard Street, Brooklyn, NY 11206
Summons 6 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39560753N

Normalized ten-character lookup: 039560753N (infraction 2P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

BC 3307.2-PEDESTRIAN PROTECTION-AT THE TIME OF MY INSPECTION I OBSERVED SIDEWALK WORK AND INADEQUATE PEDESTRIAN PROTECTION PROVIDED ON STREET-WALKWAY 3 FEET WIDE,BARIERS NOT JOINED TOGETHER-FILLED UP,PEOPLE WAL

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 19, 2026
Service date
October 19, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 157 Leonard Street, Brooklyn, NY 11206

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3307.2-PEDESTRIAN PROTECTION-AT THE TIME OF MY INSPECTION I OBSERVED SIDEWALK WORK AND INADEQUATE PEDESTRIAN PROTECTION PROVIDED ON STREET-WALKWAY 3 FEE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560753N.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560753N, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 157 Leonard Street, Brooklyn, NY 11206
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 157 Leonard Street, Brooklyn, NY 11206 — not just the summons number

For this property, start with site safety / construction operations and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
  • Jobsite fire extinguishers (1 source summons): Site fire-extinguisher compliance research and hearing-evidence coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 23, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.