NYC DOB / ECB / OATH hearings · verified property resolution

1600 Lexington Avenue, Manhattan, NY 10029 — Excavation / adjoining property protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1600 Lexington Avenue, Manhattan, NY 10029 and source-listed date December 24, 2026. Recorded concerns include excavation / adjoining property protection, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Excavation / adjoining property protectionSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
1600 Lexington Avenue, Manhattan, NY 10029
Borough
Manhattan
BIN
1804241
BBL
1016290016
Source summonses
2
Hearing dates in source
December 24, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1600 Lexington Avenue, Manhattan, NY 10029?

The uploaded record lists 2 summonses, including 039560593N (excavation / adjoining property protection), 039560592L (site safety / construction operations). The source-listed hearing date: December 24, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560593N
039560593N
8:30 AM
CLASS - 2Excavation / adjoining property protectionPENDING
39560592L
039560592L
10:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 2 recorded summonses relate at 1600 Lexington Avenue, Manhattan, NY 10029

The verified property matching links 2 distinct summonses to 1600 Lexington Avenue, Manhattan, NY 10029. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Excavation / adjoining property protection (1): source summons 039560593N. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039560592L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 15, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Excavation / adjoining property protection — ECB/OATH summons 39560593N

Normalized ten-character lookup: 039560593N (infraction 2P7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The source alleges excavation, foundation or adjacent-property protective measures were insufficient. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION, OBSERVED EXCAVATION WORK AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. PORTIONS OF THE EXCAVATION EXCEEDED 6 FEET IN DEPTH, WITH MISSING GUARDRAILS AT OPEN EDGES, CREA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1600 Lexington Avenue, Manhattan, NY 10029

Establish the exact excavation depth, exposure, neighboring property and safety/protection obligation cited; any structural danger needs prompt professional attention. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED EXCAVATION WORK AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. PORTIONS OF THE EXCAVATION EXCEEDED 6 FEE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560593N.

  • Whether adjoining-property or excavation protective work was required in the specific conditions observed
  • Whether approved engineering documents and installed protection met the relevant requirements
  • Whether measurements, construction phase and cited neighboring premises are correctly identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Immediately evaluate active excavation or neighboring-building hazards using qualified contractors and design professionals.
  • Review approved plans, survey/monitoring obligations and required protection measures, then document correction and any DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • excavation support, underpinning and protection plans
  • geotechnical or structural engineer field reports and monitoring data
  • survey and adjoining-property condition documentation
  • dated excavation photos, contractor logs and DOB approvals

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560593N, Building Violation LLC can scope excavation and adjoining-property protection hearing-evidence review after reviewing the actual notice and current DOB/OATH record.

Request help with excavation / adjoining property protection at 1600 Lexington Avenue, Manhattan, NY 10029
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560592L

Normalized ten-character lookup: 039560592L (infraction 2F7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION, EXCAVATION WORK WAS IN PROGRESS AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. EARTHWORK NOTIFICATION WAS REQUESTED FROM THE CONSTRUCTION SUPERINTENDENT BUT WAS NOT PRO

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1600 Lexington Avenue, Manhattan, NY 10029

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, EXCAVATION WORK WAS IN PROGRESS AT A PROPOSED 6-STORY BUILDING ADJACENT TO 1406 LEXINGTON AVENUE. EARTHWORK NOTIFICATION WAS REQUEST…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560592L.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560592L, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 1600 Lexington Avenue, Manhattan, NY 10029
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1600 Lexington Avenue, Manhattan, NY 10029 — not just the summons number

For this property, start with excavation / adjoining property protection and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Excavation / adjoining property protection (1 source summons): Excavation and adjoining-property protection hearing-evidence review.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 24, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.