NYC DOB / ECB / OATH hearings · verified property resolution

1660 2 Avenue, Manhattan, NY 10028 — Elevator / hoist compliance and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1660 2 Avenue, Manhattan, NY 10028 and source-listed dates December 14, 2026, December 17, 2026. Recorded concerns include elevator / hoist compliance, sidewalk shed / scaffolding. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Elevator / hoist complianceSidewalk shed / scaffolding

Verified premises, hearing and enforcement snapshot

Verified premises address
1660 2 Avenue, Manhattan, NY 10028
Borough
Manhattan
BIN
1050025
BBL
1015490001
Source summonses
2
Hearing dates in source
December 14, 2026, December 17, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1660 through 1680 2 AVENUE; 300 through 334 EAST 87 STREET; 301 through 329 EAST 86 STREET

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1660 2 Avenue, Manhattan, NY 10028?

The uploaded record lists 2 summonses, including 039177949N (elevator / hoist compliance), 039545491R (sidewalk shed / scaffolding). The source-listed hearing dates: December 14, 2026, December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39177949N
039177949N
8:30 AM
CLASS - 1Elevator / hoist compliancePENDING
39545491R
039545491R
8:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 2 recorded summonses relate at 1660 2 Avenue, Manhattan, NY 10028

The verified property matching links 2 distinct summonses to 1660 2 Avenue, Manhattan, NY 10028. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Elevator / hoist compliance (1): source summons 039177949N. Check this charge separately, even when its documents can be gathered with other property records.

Sidewalk shed / scaffolding (1): source summons 039545491R. Check this charge separately, even when its documents can be gathered with other property records.

More than one source-listed hearing date: December 14, 2026, December 17, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Elevator / hoist compliance — ECB/OATH summons 39177949N

Normalized ten-character lookup: 039177949N (infraction 151)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation addresses elevators, hoists or related tests, maintenance or safety obligations. Key locations/components named in the source: door or exit route, elevator or lift.

Inspector narrative as preserved in source data — potentially incomplete

VF.... CEASEUSED.... DOOR RESTRICTOR NOT WORKING REPAIR AND ARRANGE INSPECTION WITH D O B ... .. HOIST WAY DOOR GOBS WORN REPLACE... 17-H-11...PRESENT MAINTENANCE COMPANY STICKER PUT ON ELEVATOR MAIN SWITCH..

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
Issue date
February 20, 2026
Service date
February 20, 2026
Source severity
CLASS - 1
Source violation type
Elevators
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1660 2 Avenue, Manhattan, NY 10028

Identify the numbered device and exact testing, inspection, permit or safety defect cited; compare it with the equipment history. Key locations/components named in the source: door or exit route, elevator or lift. Record-specific inspection detail: Inspector text begins: “VF.... CEASEUSED.... DOOR RESTRICTOR NOT WORKING REPAIR AND ARRANGE INSPECTION WITH D O B ... .. HOIST WAY DOOR GOBS WORN REPLACE... 17-H-11...PRESENT MAIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039177949N.

  • Whether the cited device and required reporting/inspection period are correct
  • Whether testing, inspection or corrections had been completed and accepted by the relevant date
  • Whether the record confuses a different device or reporting cycle
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address active safety hazards and arrange licensed elevator/hoist contractor inspection.
  • Complete applicable DOB filings, tests, repairs, permits and final sign-offs.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • device inspection and service documentation
  • device-number identification and DOB inspection history
  • elevator maintenance logs and test filings
  • licensed contractor inspection, work and correction records
  • dated photos and DOB acceptance documentation

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039177949N, Building Violation LLC can scope elevator/hoist hearing response and device-record coordination after reviewing the actual notice and current DOB/OATH record.

Request help with elevator / hoist compliance at 1660 2 Avenue, Manhattan, NY 10028
Summons 2 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39545491R

Normalized ten-character lookup: 039545491R (infraction 223)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed, garage or parking area.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED PER CODE SPECIFICATIONS WITH ROTTING MUDSILLS AT ACTIVE DRIVEWAY CAUSING HAZARDOUS CONDITIONS.MAINTAIN

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
October 1, 2025
Service date
October 1, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,400.00
Balance field in extract
$2,400.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1660 2 Avenue, Manhattan, NY 10028

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed, garage or parking area. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED PER CODE SPECIFICATIONS WITH ROTTING MUDSILLS AT ACTIVE DRIVEWAY CAUSING HAZARDOUS CON…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039545491R.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • parking/site-plan approvals and photos of the cited use
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039545491R, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 1660 2 Avenue, Manhattan, NY 10028
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1660 2 Avenue, Manhattan, NY 10028 — not just the summons number

For this property, start with elevator / hoist compliance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Elevator / hoist compliance (1 source summons): Elevator/hoist hearing response and device-record coordination.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 14, 2026, December 17, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.