1666 Madison Place, Brooklyn, NY 11229 — Stop-work order / continued work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 1666 Madison Place, Brooklyn, NY 11229 and source-listed date December 4, 2026. Recorded concerns include stop-work order / continued work, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Stop-work order / continued workWork without a permit
Verified premises, hearing and enforcement snapshot
Verified premises address
1666 Madison Place, Brooklyn, NY 11229
Borough
Brooklyn
BIN
3212040
BBL
3077010064
Source summonses
3
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 1666 MADISON PLACE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: 3 default-status record(s) in the source; one or more Class 1 source allegations. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1666 Madison Place, Brooklyn, NY 11229?
The uploaded record lists 3 summonses, including 039140962Z (stop-work order / continued work), 039140967H (stop-work order / continued work), 039140981Y (work without a permit). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 1666 Madison Place, Brooklyn, NY 11229
The verified property matching links 3 distinct summonses to 1666 Madison Place, Brooklyn, NY 11229. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Stop-work order / continued work (2): source summons 039140962Z, 039140967H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Work without a permit (1): source summons 039140981Y. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list March 10, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Stop-work order / continued work — ECB/OATH summons 39140962Z
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: structural framing.
Inspector narrative as preserved in source data
NOTED: WORK WITHOUT PERMIT FSWO FOR ALL BEING DONE ON THE HORIZONTAL AND VERTICAL STRUCTURE ATTACHED TO THE EXISTING BUILDING AT EXPO #3, OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 10, 2025
Service date
March 10, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1666 Madison Place, Brooklyn, NY 11229
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “NOTED: WORK WITHOUT PERMIT FSWO FOR ALL BEING DONE ON THE HORIZONTAL AND VERTICAL STRUCTURE ATTACHED TO THE EXISTING BUILDING AT EXPO #3, OBTAIN PERMIT”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140962Z.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved framing plans and structural engineer assessment
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039140962Z, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation, structural framing.
Inspector narrative as preserved in source data
NOTED: WORK WITHOUT PERMIT FSWO FOR ALL ELECTRICAL WORK BEING DONE ON THE HORIZONTAL AND VERTICAL STRUCTURE AT EXPO # 3, OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 10, 2025
Service date
March 10, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1666 Madison Place, Brooklyn, NY 11229
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation, structural framing. Record-specific inspection detail: Inspector text begins: “NOTED: WORK WITHOUT PERMIT FSWO FOR ALL ELECTRICAL WORK BEING DONE ON THE HORIZONTAL AND VERTICAL STRUCTURE AT EXPO # 3, OBTAIN PERMIT”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140967H.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
approved framing plans and structural engineer assessment
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039140967H, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data
NOTED: WORK WITHOUT PERMIT VIOLATION ISSUED FOR THE INSTALLATION OF THE MINI SPLIT CONDENSERS WITH TWO BREAKER BOXES ONE SAYS ATTIC THE OTHER SAYS BASEMENT LEADING INTO THE RESIDENT AT EXPO #4, OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 10, 2025
Service date
March 10, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1666 Madison Place, Brooklyn, NY 11229
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “NOTED: WORK WITHOUT PERMIT VIOLATION ISSUED FOR THE INSTALLATION OF THE MINI SPLIT CONDENSERS WITH TWO BREAKER BOXES ONE SAYS ATTIC THE OTHER SAYS BASEMENT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140981Y.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039140981Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1666 Madison Place, Brooklyn, NY 11229 — not just the summons number
For this property, start with stop-work order / continued work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.