1682 Banyer Place, Bronx, NY 10473 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 1682 Banyer Place, Bronx, NY 10473 and source-listed date December 11, 2026. Recorded concerns include work without a permit, illegal occupancy / certificate of occupancy, fire escape / exit obstruction and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitIllegal occupancy / certificate of occupancyFire escape / exit obstructionUnpermitted electrical work
Verified premises, hearing and enforcement snapshot
Verified premises address
1682 Banyer Place, Bronx, NY 10473
Borough
Bronx
BIN
2113967
BBL
2036600121
Source summonses
5
Hearing dates in source
December 11, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 1682 BANYER PLACE; 1682A BANYER PLACE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1682 Banyer Place, Bronx, NY 10473?
The uploaded record lists 5 summonses, including 039183754Y (illegal occupancy / certificate of occupancy), 039183755X (work without a permit), 039183756H (work without a permit), 039183758L (fire escape / exit obstruction) and additional tickets. The source-listed hearing date: December 11, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 1682 Banyer Place, Bronx, NY 10473
The verified property matching links 5 distinct summonses to 1682 Banyer Place, Bronx, NY 10473. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (2): source summons 039183755X, 039183756H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Fire escape / exit obstruction (1): source summons 039183758L. Check this charge separately, even when its documents can be gathered with other property records.
Illegal occupancy / certificate of occupancy (1): source summons 039183754Y. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039183760K. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 5 summonses list April 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: The same approved floor plan may be relevant to lawful occupancy and means of egress; removing an exit obstruction does not automatically legalize an extra dwelling unit.
Potential shared workstream: If a project altered the same route of exit, the permit review and egress correction may require one coordinated plan; establish that connection from the approved plans and cited locations.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Illegal occupancy / certificate of occupancy — ECB/OATH summons 39183754Y
The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area, electrical installation, gas or boiler equipment, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
CONTRARY TO C-OF-O 200934418B WHICH INDICATES CELLAR AS BOILER & STORAGE. AT TIME OF INSPECTION - CELLAR WAS OBSERVED CREATED & OCCUPIED AS A CLASS 'A' APT WITH 3 PC BTHRM; KITCHEN WITH ELECTRIC COOKING (TOASTE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
April 7, 2026
Service date
April 8, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1682 Banyer Place, Bronx, NY 10473
Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area, electrical installation, gas or boiler equipment, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “CONTRARY TO C-OF-O 200934418B WHICH INDICATES CELLAR AS BOILER & STORAGE. AT TIME OF INSPECTION - CELLAR WAS OBSERVED CREATED & OCCUPIED AS A CLASS 'A' APT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183754Y.
Whether the cited space and alleged use match the actual premises and inspection period
Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
Whether the described occupants, partitioning or unit configuration existed at the relevant time
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
licensed-trade test results and equipment/permit records
current and historical Certificates of Occupancy or DOB occupancy records
approved floor plans, unit-count and building-use documentation
dated floor/interior photographs and credible usage records
lease or occupancy documents appropriately redacted
professional survey/architectural assessment and permit history
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183754Y, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, kitchen or bathroom.
Inspector narrative as preserved in source data
W/O A PERMIT. NOTED: AT CELLAR - WATER & WASTE LINES INSTALLED FOR A 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 7, 2026
Service date
April 8, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1682 Banyer Place, Bronx, NY 10473
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT CELLAR - WATER & WASTE LINES INSTALLED FOR A 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA., OBTAIN ALL PERMITS”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183755X.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183755X, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data
W/O A PERMIT. NOTED: AT CELLAR - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE 3 BDRMS & BTHRM., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 7, 2026
Service date
April 8, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1682 Banyer Place, Bronx, NY 10473
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT CELLAR - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE 3 BDRMS & BTHRM., OBTAIN ALL PERMITS”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183756H.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183756H, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: cellar or basement area, door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT TIME OF INSPECTION - KEY LOCKING DEVICES WERE OBSERVED INSTALLED AT CELLAR BDR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
226 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT
Issue date
April 7, 2026
Service date
April 8, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1682 Banyer Place, Bronx, NY 10473
Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: cellar or basement area, door or exit route. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT TIME OF INSPECTION - KE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183758L.
Whether the cited route is a required exit component for this occupancy
Whether the alleged objects, locks or configuration actually affected required egress at the cited location
Whether the area and date are accurately identified and whether correction can be documented
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Remove hazards and restore required safe egress immediately.
When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
door/exit photographs and approved egress plans
photographs of the exact door, stair, hall, landing or fire escape
approved floor and means-of-egress plans
repair/removal invoices and dated completion photographs
fire-escape or professional inspection and compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183758L, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation.
Inspector narrative as preserved in source data
W/O A PERMIT. NOTED: AT CELLAR - ELECTRICAL WIRING OBSERVED FOR ADDL'T LIGHTS, SWITCHES, OUTLETS., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
April 7, 2026
Service date
April 8, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1682 Banyer Place, Bronx, NY 10473
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT CELLAR - ELECTRICAL WIRING OBSERVED FOR ADDL'T LIGHTS, SWITCHES, OUTLETS., OBTAIN PERMIT”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183760K.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183760K, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1682 Banyer Place, Bronx, NY 10473 — not just the summons number
For this property, start with work without a permit and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
Illegal occupancy / certificate of occupancy (1 source summons): Occupancy/illegal-conversion research, hearing preparation and design-professional coordination.
Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 11, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.