1714-1726 80 Street, Brooklyn, NY 11214 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1714-1726 80 Street, Brooklyn, NY 11214 and source-listed date December 2, 2026. Recorded concerns include work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permit
Verified premises, hearing and enforcement snapshot
Verified premises address
1714-1726 80 Street, Brooklyn, NY 11214
Borough
Brooklyn
BIN
3163285
BBL
3062840019
Source summonses
2
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 1714 through 1726 80 STREET; 8001 through 8011 NEW UTRECHT AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1714-1726 80 Street, Brooklyn, NY 11214?
The uploaded record lists 2 summonses, including 039205089H (work without a permit), 039205082P (work without a permit). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 1714-1726 80 Street, Brooklyn, NY 11214
The verified property matching links 2 distinct summonses to 1714-1726 80 Street, Brooklyn, NY 11214. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (2): source summons 039205089H, 039205082P. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Shared source issue date: 2 summonses list March 18, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work without a permit — ECB/OATH summons 39205089H
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: apartment or dwelling unit, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION AT A 4-STORY MULTI DWELLING BUILDING OBSERVED AT APARTMENT C8 NEWLY INSTALLED BATH TUB AND DRAIN PIPE. ALSO, OBSERVED CAPPED PIPING IN KITCHEN. ALL PLUMBING WORK DONE WITHOUT PERMITS,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 18, 2026
Service date
September 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1714-1726 80 Street, Brooklyn, NY 11214
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION AT A 4-STORY MULTI DWELLING BUILDING OBSERVED AT APARTMENT C8 NEWLY INSTALLED BATH TUB AND DRAIN PIPE. ALSO, OBSERVED CAPPED PIPI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205089H.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved unit layout and relevant lawful occupancy records
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205089H, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION AT A 4-STORY MULTI DWELLING BUILDING OBSERVED AT APARTMENT C8 THE APARTMENT WAS DEMOLISHED TO STUDS AND BEAMS AND ALSO OBSERVED NEWLY FRAMED WALL WITH 2X4 STUDS. WORK DONE WITHOUT PERM
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 18, 2026
Service date
September 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1714-1726 80 Street, Brooklyn, NY 11214
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION AT A 4-STORY MULTI DWELLING BUILDING OBSERVED AT APARTMENT C8 THE APARTMENT WAS DEMOLISHED TO STUDS AND BEAMS AND ALSO OBSERVED N…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205082P.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved unit layout and relevant lawful occupancy records
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205082P, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1714-1726 80 Street, Brooklyn, NY 11214 — not just the summons number
For this property, start with work without a permit. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.