NYC DOB / ECB / OATH hearings · verified property resolution

1771 Fulton Avenue, Bronx, NY 10457 — Unsafe condition / maintenance and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1771 Fulton Avenue, Bronx, NY 10457 and source-listed date December 7, 2026. Recorded concerns include unsafe condition / maintenance, fire escape / exit obstruction. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Unsafe condition / maintenanceFire escape / exit obstruction

Verified premises, hearing and enforcement snapshot

Verified premises address
1771 Fulton Avenue, Bronx, NY 10457
Borough
Bronx
BIN
2009663
BBL
2029300062
Source summonses
2
Hearing dates in source
December 7, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1771 FULTON AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1771 Fulton Avenue, Bronx, NY 10457?

The uploaded record lists 2 summonses, including 039182698Y (unsafe condition / maintenance), 039182707R (fire escape / exit obstruction). The source-listed hearing date: December 7, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39182698Y
039182698Y
8:30 AM
CLASS - 1Unsafe condition / maintenancePENDING
39182707R
039182707R
8:30 AM
CLASS - 1Fire escape / exit obstructionPENDING

How the 2 recorded summonses relate at 1771 Fulton Avenue, Bronx, NY 10457

The verified property matching links 2 distinct summonses to 1771 Fulton Avenue, Bronx, NY 10457. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Fire escape / exit obstruction (1): source summons 039182707R. Check this charge separately, even when its documents can be gathered with other property records.

Unsafe condition / maintenance (1): source summons 039182698Y. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list March 31, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39182698Y

Normalized ten-character lookup: 039182698Y (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER FOR SUMMONS 39107756N. OBSERVED AT EXP 3, THE +20 FT HIGH REAR RETAINING WALL IS IN THE STATE OF DISREPAIR WITH CRACKS, MISSING MORTAR AND STONES. THIS CR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
March 31, 2026
Service date
March 31, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1771 Fulton Avenue, Bronx, NY 10457

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER FOR SUMMONS 39107756N. OBSERVED AT EXP 3, THE +20 FT HIGH REAR RETAINING WALL IS IN THE STATE OF DI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039182698Y.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039182698Y, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 1771 Fulton Avenue, Bronx, NY 10457
Summons 2 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39182707R

Normalized ten-character lookup: 039182707R (infraction 127)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: front exposure, door or exit route, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED AT EXP 1, THE FIRE-ESCAPE PLATFORMS ARE OBSTRUCTED BY AC UNITS ON THE 3RD AND 5TH FLOORS RIGHT WINDOWS, WHICH WILL HINDER EGRESS OUT OF THE BUILDING IN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
Issue date
March 31, 2026
Service date
March 31, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1771 Fulton Avenue, Bronx, NY 10457

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: front exposure, door or exit route, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED AT EXP 1, THE FIRE-ESCAPE PLATFORMS ARE OBSTRUCTED BY AC UNITS ON THE 3RD AND 5TH FLOORS RIGHT WI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039182707R.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • door/exit photographs and approved egress plans
  • equipment photos and licensed installation/permit evidence
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039182707R, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 1771 Fulton Avenue, Bronx, NY 10457
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1771 Fulton Avenue, Bronx, NY 10457 — not just the summons number

For this property, start with unsafe condition / maintenance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Unsafe condition / maintenance (1 source summons): Building-maintenance hearing review and documented correction closeout.
  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 7, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.