NYC DOB / ECB / OATH hearings · verified property resolution

1790 Marmion Avenue, Bronx, NY 10460 — Fire alarm / sprinkler / suppression and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1790 Marmion Avenue, Bronx, NY 10460 and source-listed date December 18, 2026. Recorded concerns include fire alarm / sprinkler / suppression, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Fire alarm / sprinkler / suppressionWork without a permit

Verified premises, hearing and enforcement snapshot

Verified premises address
1790 Marmion Avenue, Bronx, NY 10460
Borough
Bronx
BIN
2010098
BBL
2029570019
Source summonses
2
Hearing dates in source
December 18, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1790 MARMION AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1790 Marmion Avenue, Bronx, NY 10460?

The uploaded record lists 2 summonses, including 039206898M (fire alarm / sprinkler / suppression), 039206897K (work without a permit). The source-listed hearing date: December 18, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39206898M
039206898M
8:30 AM
CLASS - 1Fire alarm / sprinkler / suppressionADMIT/IN-VIO
39206897K
039206897K
10:30 AM
CLASS - 2Work without a permitADMIT/IN-VIO

How the 2 recorded summonses relate at 1790 Marmion Avenue, Bronx, NY 10460

The verified property matching links 2 distinct summonses to 1790 Marmion Avenue, Bronx, NY 10460. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Fire alarm / sprinkler / suppression (1): source summons 039206898M. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039206897K. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 6, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Fire alarm / sprinkler / suppression — ECB/OATH summons 39206898M

Normalized ten-character lookup: 039206898M (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges a deficiency in fire detection, alarm, sprinkler or suppression equipment. Key locations/components named in the source: fire-protection system.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED OBSTRUCTED AND LACK OF SPRINKLER COVERAGE IN THE LAUNDRY ROOM CONTRARY TO BC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS. IT MANDATES THAT SPRINKLERS BE POSITIONED TO AVOID OB

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 6, 2026
Service date
October 6, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
ADMIT/IN-VIO
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$0.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 1790 Marmion Avenue, Bronx, NY 10460

Identify which system, floor or occupancy is cited; check whether it was required and what installation, maintenance, testing or sign-off was missing at inspection. Key locations/components named in the source: fire-protection system. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED OBSTRUCTED AND LACK OF SPRINKLER COVERAGE IN THE LAUNDRY ROOM CONTRARY TO BC 903.3.3 OBSTRUCTED LOCATIONS IN AUTOMATIC FIRE SPRINKLER SYSTEMS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206898M.

  • Whether the listed system was legally required for the approved use and occupancy
  • Whether accepted fire-protection plans, test reports or system inspections cover the issue
  • Whether the inspector described the correct system, equipment and location
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Treat functional fire-safety defects as urgent and obtain qualified inspection.
  • Coordinate any needed FDNY/DOB permits, licensed fire-safety contractor corrections, tests and acceptance paperwork.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • fire-system test certificates and approved system drawings
  • approved fire-protection/alarm plans and permits
  • system inspection, service and acceptance test reports
  • contractor invoices and before/after dated equipment photos
  • FDNY or DOB notices and agency sign-offs

Outcome-style status in source: what to verify before acting

The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.

Need a summons-specific action plan? For 039206898M, Building Violation LLC can scope fire-protection summons review and licensed-contractor compliance coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire alarm / sprinkler / suppression at 1790 Marmion Avenue, Bronx, NY 10460
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39206897K

Normalized ten-character lookup: 039206897K (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED WATER HEATERS INSTALLED WITHOUT ANY PERMITS FILE ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES PERMITS., OBTAIN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 6, 2026
Service date
October 6, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
ADMIT/IN-VIO
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$0.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1790 Marmion Avenue, Bronx, NY 10460

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED WATER HEATERS INSTALLED WITHOUT ANY PERMITS FILE ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206897K.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Outcome-style status in source: what to verify before acting

The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.

Need a summons-specific action plan? For 039206897K, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 1790 Marmion Avenue, Bronx, NY 10460
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1790 Marmion Avenue, Bronx, NY 10460 — not just the summons number

For this property, start with fire alarm / sprinkler / suppression and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Fire alarm / sprinkler / suppression (1 source summons): Fire-protection summons review and licensed-contractor compliance coordination.
  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 18, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.