Work contrary to approved plans — ECB/OATH summons 39545241Y
Normalized ten-character lookup: 039545241Y (infraction 282)
Source allegation and actual cited law
The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED ACTIVE JOBSITE W/ MAKESHIFT CONNECTIONS ON PIPE SCAFFOLD SYSTEM @ EXPO #1. OSHA PLANKS USED TO CONSTRUCT GUARDRAILS AT TOP BAY & WIRE TIED CONNECTION IN OTHER AREAS. DRAWINGS CALL FOR HORIZONTAL GUARDR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
- Issue date
- September 23, 2025
- Service date
- September 23, 2025
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- DEFAULT
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- NO COMPLIANCE RECORDED
- Penalty field in extract
- $1,280.00
- Balance field in extract
- $1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 183 Avenue B, Manhattan, NY 10009
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED ACTIVE JOBSITE W/ MAKESHIFT CONNECTIONS ON PIPE SCAFFOLD SYSTEM @ EXPO #1. OSHA PLANKS USED TO CONSTRUCT GUARDRAILS AT TOP BAY & WIRE TIED CONNECT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039545241Y.
- Whether the cited plans were the operative approved set on the inspection date
- Whether an approved amendment, phased work or as-built record covers the observed condition
- Whether the alleged difference is accurately described and located
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Compare field conditions with approved documents through a registered design professional.
- Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- approved plans, amendments and application history
- current as-built measurements or professional field report
- dated construction photographs and contractor records
- inspection and sign-off documents
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.