188 Locust Avenue, Staten Island, NY 10306 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 188 Locust Avenue, Staten Island, NY 10306 and source-listed date December 16, 2026. Recorded concerns include work without a permit, unpermitted electrical work, illegal occupancy / certificate of occupancy. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitUnpermitted electrical workIllegal occupancy / certificate of occupancy
Verified premises, hearing and enforcement snapshot
Verified premises address
188 Locust Avenue, Staten Island, NY 10306
Borough
Staten Island
BIN
5052525
BBL
5036340063
Source summonses
4
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 188 LOCUST AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 188 Locust Avenue, Staten Island, NY 10306?
The uploaded record lists 4 summonses, including 039201430Y (unpermitted electrical work), 039201431X (work without a permit), 039201432H (illegal occupancy / certificate of occupancy), 039201433J (work without a permit). The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 4 recorded summonses relate at 188 Locust Avenue, Staten Island, NY 10306
The verified property matching links 4 distinct summonses to 188 Locust Avenue, Staten Island, NY 10306. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (2): source summons 039201431X, 039201433J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Illegal occupancy / certificate of occupancy (1): source summons 039201432H. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039201430Y. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 4 summonses list August 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Unpermitted electrical work — ECB/OATH summons 39201430Y
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 FOR ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION,OBSERVED AT CELLAR INSTALLED ELECTRICAL WIRING FOR FIXTURES, LIGHTING
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 188 Locust Avenue, Staten Island, NY 10306
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation. Record-specific inspection detail: Inspector text begins: “AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 FOR ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION,OBSERVED AT CE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201430Y.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201430Y, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 FOR WORK WITHOUT A PERMIT AT CELLAR LEVEL ,ERECTED PARTITION WALLS,FOR LIVING ROOM, BATHROOM,KITCHEN ,AND A ROOM,THERE IS NO PERM
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 188 Locust Avenue, Staten Island, NY 10306
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 FOR WORK WITHOUT A PERMIT AT CELLAR LEVEL ,ERECTED PARTITION WALLS,FOR LIV…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201431X.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201431X, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data — potentially incomplete
AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 ,FOR OCCUPANCY CONTRARY BY THE C OF O ,AT TIME OF INSPECTION, OBSERVED AT CELLAR, PARTITION WALLS INSTALLED CREATING A LIVING ROO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 188 Locust Avenue, Staten Island, NY 10306
Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 ,FOR OCCUPANCY CONTRARY BY THE C OF O ,AT TIME OF INSPECTION, OBSERVED AT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201432H.
Whether the cited space and alleged use match the actual premises and inspection period
Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
Whether the described occupants, partitioning or unit configuration existed at the relevant time
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
current and historical Certificates of Occupancy or DOB occupancy records
approved floor plans, unit-count and building-use documentation
dated floor/interior photographs and credible usage records
lease or occupancy documents appropriately redacted
professional survey/architectural assessment and permit history
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201432H, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
AS PER PERVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 ,FOR WORK WITHOUT A PERMIT ,AT CELLAR WATER AND WASTE LINES INSTALLED FOR 3 PIECE BATHROOM ,TOILET, BATHTUB, AND SHOWER ,ALSO GAS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 188 Locust Avenue, Staten Island, NY 10306
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “AS PER PERVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 04/20/2026 BY BADGE 3407 ,FOR WORK WITHOUT A PERMIT ,AT CELLAR WATER AND WASTE LINES INSTALLED FOR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201433J.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201433J, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 188 Locust Avenue, Staten Island, NY 10306 — not just the summons number
For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
Illegal occupancy / certificate of occupancy (1 source summons): Occupancy/illegal-conversion research, hearing preparation and design-professional coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.