1908 Muliner Avenue, Bronx, NY 10462 — Construction fence / site protection and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 1908 Muliner Avenue, Bronx, NY 10462 and source-listed date December 4, 2026. Recorded concerns include construction fence / site protection, roadway / sidewalk work-zone permits. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Construction fence / site protectionRoadway / sidewalk work-zone permits
Verified premises, hearing and enforcement snapshot
Verified premises address
1908 Muliner Avenue, Bronx, NY 10462
Borough
Bronx
BIN
2131196
BBL
Not provided
Source summonses
4
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1908 Muliner Avenue, Bronx, NY 10462?
The uploaded record lists 4 summonses, including 039559626M (construction fence / site protection), 039559457K (construction fence / site protection), 039559627Y (construction fence / site protection), 039559628X (roadway / sidewalk work-zone permits). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 4 recorded summonses relate at 1908 Muliner Avenue, Bronx, NY 10462
The verified property matching links 4 distinct summonses to 1908 Muliner Avenue, Bronx, NY 10462. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Construction fence / site protection (3): source summons 039559626M, 039559457K, 039559627Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Roadway / sidewalk work-zone permits (1): source summons 039559628X. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Construction fence / site protection — ECB/OATH summons 39559626M
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: cellar or basement area, construction fence or enclosure, electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, NO PROJECT INFORMATION PANEL WAS INSTALLED ON THE CONSTRUCTION FENCE. CONDITION DOES NOT CONFORM TO BC 3301.9, WHICH REQUIRES A COMP
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1908 Muliner Avenue, Bronx, NY 10462
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: cellar or basement area, construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, NO PROJECT INFORMATION PANEL WAS INSTALLED ON THE CONSTRUCTION FENCE. CONDITI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559626M.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
site-fence photos, dimensions and inspection log
licensed electrician report and electrical filing history
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559626M, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure, electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED 2 STORY NB ON FOUNDATION PHASE WITH CONSTRUCTION PHASE INSTALLED @ PERIMETER OF JOBSITE. CONSTRUCTION FENCE HAD NO PROJECT INFORMATION PANEL INSTALLED AS PER CODE. PROVIDE PROJECT INFORMATION PANEL AS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Issue date
September 22, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1908 Muliner Avenue, Bronx, NY 10462
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED 2 STORY NB ON FOUNDATION PHASE WITH CONSTRUCTION PHASE INSTALLED @ PERIMETER OF JOBSITE. CONSTRUCTION FENCE HAD NO PROJECT INFORMATION PANEL INSTA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559457K.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
licensed electrician report and electrical filing history
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559457K, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: cellar or basement area, construction fence or enclosure, electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, CONSTRUCTION FENCE SHOWED DEFICIENCIES. AT EXPOSURE #1, MISSING VIEWING TRANSPARENT PANEL, PORTIONS OF PLYWOOD NOT PROPERLY SECURED
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1908 Muliner Avenue, Bronx, NY 10462
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: cellar or basement area, construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, CONSTRUCTION FENCE SHOWED DEFICIENCIES. AT EXPOSURE #1, MISSING VIEWING TRANS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559627Y.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
site-fence photos, dimensions and inspection log
licensed electrician report and electrical filing history
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559627Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The inspector identifies work-zone equipment, barriers, containers or temporary occupancy of a street or sidewalk, possibly with a missing or expired DOT permit. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, OBSERVED SIDEWALK AT EXP#1 INADEQUATELY MAINTAINED/REPAIR, BROKEN PCS OF CONCRETE & UNEVEN SURFACE THIS CONDITION WILL CAUSE TRIPPIN
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1908 Muliner Avenue, Bronx, NY 10462
Determine the exact street/sidewalk location, work-zone equipment, DOT occupancy permit dates and whether pedestrian protection was sufficient. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING ON FOUNDATION/CELLAR PHASE, OBSERVED SIDEWALK AT EXP#1 INADEQUATELY MAINTAINED/REPAIR, BROKEN PCS OF CONC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559628X.
Whether a valid permit covered the correct roadway segment, dates and equipment
Whether a temporary encroachment or pedestrian obstruction occurred as described
Whether contemporaneous permits, inspection logs or removal records contradict the allegation
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe sidewalk/roadway obstructions and secure the applicable permit or remove equipment where appropriate.
Coordinate contractor and DOT documentation, photographs and any DOB compliance response for the specific site condition.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
NYC DOT permits and permit effective dates
dated street/sidewalk photos and work-zone layout
barrier, dumpster or equipment placement and removal logs
contractor site-safety inspection and access records
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559628X, Building Violation LLC can scope roadway/sidewalk work-zone summons analysis and permit coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1908 Muliner Avenue, Bronx, NY 10462 — not just the summons number
For this property, start with construction fence / site protection and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Construction fence / site protection (3 source summonses): Site-safety violation response and fence/protection correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.