Unpermitted electrical work — ECB/OATH summons 39206096K
Normalized ten-character lookup: 039206096K (infraction 2C4)
Source allegation and actual cited law
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation, apartment or dwelling unit.
Inspector narrative as preserved in source data
ECB VIOLATION ISSUED FOR ELECTRICAL WORK W/O PERMIT. OBSERVED AT EXPOSURE 1 INSTALLATION OF CONDENSER UNIT. WORK 100% COMPLETE., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
- Issue date
- September 29, 2026
- Service date
- September 29, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 193-02 99 Avenue, Queens, NY 11423
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “ECB VIOLATION ISSUED FOR ELECTRICAL WORK W/O PERMIT. OBSERVED AT EXPOSURE 1 INSTALLATION OF CONDENSER UNIT. WORK 100% COMPLETE., OBTAIN PERMIT”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206096K.
- Whether the cited work required an electrical permit at the relevant time
- Whether a licensed electrician had already filed, inspected or signed off the cited work
- Whether the described installation is correctly located and attributed
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
- If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- licensed electrician report and electrical filing history
- approved unit layout and relevant lawful occupancy records
- electrical permit/job history and inspection results
- licensed electrician invoices, test reports and sign-offs
- dated photos of panels, circuits or fixtures referenced
- approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206096K, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with unpermitted electrical work at 193-02 99 Avenue, Queens, NY 11423