The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 195 West Houston Street, Manhattan, NY 10014 and source-listed date December 10, 2026. Recorded concerns include work contrary to approved plans, construction fall / overhead protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work contrary to approved plansConstruction fall / overhead protection

Verified premises, hearing and enforcement snapshot

Verified premises address
195 West Houston Street, Manhattan, NY 10014
Borough
Manhattan
BIN
1008124
BBL
1005200028
Source summonses
2
Hearing dates in source
December 10, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 195 WEST HOUSTON STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 195 West Houston Street, Manhattan, NY 10014?

The uploaded record lists 2 summonses, including 039560139N (work contrary to approved plans), 039560138L (construction fall / overhead protection). The source-listed hearing date: December 10, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560139N
039560139N
8:30 AM
CLASS - 2Work contrary to approved plansPENDING
39560138L
039560138L
10:30 AM
CLASS - 2Construction fall / overhead protectionPENDING

How the 2 recorded summonses relate at 195 West Houston Street, Manhattan, NY 10014

The verified property matching links 2 distinct summonses to 195 West Houston Street, Manhattan, NY 10014. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fall / overhead protection (1): source summons 039560138L. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039560139N. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 5, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560139N

Normalized ten-character lookup: 039560139N (infraction 282)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: front exposure.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED A PULLEY SYSTEM WAS INSTALLED ON THE SCAFFOLD @ EXP 1 BUT IS NOT SHOWN OR APPROVED ON PLANS. UNAPPROVED PULLEY SYSTEM CAN IMPOSE ADDITIONAL LOADS AND FORCES ON THE SCAFFOLD THAT WERE NOT ACCOUNTED FOR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 195 West Houston Street, Manhattan, NY 10014

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “OBSERVED A PULLEY SYSTEM WAS INSTALLED ON THE SCAFFOLD @ EXP 1 BUT IS NOT SHOWN OR APPROVED ON PLANS. UNAPPROVED PULLEY SYSTEM CAN IMPOSE ADDITIONAL LOADS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560139N.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560139N, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 195 West Houston Street, Manhattan, NY 10014
Summons 2 of the source-linked property

Construction fall / overhead protection — ECB/OATH summons 39560138L

Normalized ten-character lookup: 039560138L (infraction 2P4)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION, THE SITE WAS OBSERVED WITHOUT THE REQUIRED ROOF PROTECTION @EXP 4 FOR PROPERTY (197 WEST HOUSTON ST). THE CONDITION LEAVES THE ADJACENT PROPERTY EXPOSED TO POTENTIAL DAMAGE FROM CONSTRUCT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P4
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 195 West Houston Street, Manhattan, NY 10014

Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, THE SITE WAS OBSERVED WITHOUT THE REQUIRED ROOF PROTECTION @EXP 4 FOR PROPERTY (197 WEST HOUSTON ST). THE CONDITION LEAVES THE ADJAC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560138L.

  • Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
  • Whether engineered protection drawings and installation records cover the cited area
  • Whether the cited work phase or affected neighboring area is accurately identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
  • Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • site safety plan and engineered protection details
  • dated photographs tied to the specific exposure and floor
  • guardrail, netting or overhead-cover installation and inspection records
  • contractor corrective work logs and any adjacent-property access records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560138L, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.

Request help with construction fall / overhead protection at 195 West Houston Street, Manhattan, NY 10014
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 195 West Houston Street, Manhattan, NY 10014 — not just the summons number

For this property, start with work contrary to approved plans and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
  • Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 10, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.