NYC DOB / ECB / OATH hearings · verified property resolution

2003 East 3 Street, Brooklyn, NY 11223 — Construction fence / site protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 1 DOB/ECB/OATH summons with 2003 East 3 Street, Brooklyn, NY 11223 and source-listed date December 16, 2026. Recorded concerns include construction fence / site protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Construction fence / site protection

Verified premises, hearing and enforcement snapshot

Verified premises address
2003 East 3 Street, Brooklyn, NY 11223
Borough
Brooklyn
BIN
3191822
BBL
3071060140
Source summonses
1
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 2003 EAST 3 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What is the December 2026 OATH hearing for at 2003 East 3 Street, Brooklyn, NY 11223?

The uploaded record lists 1 summons, including 039560318Z (construction fence / site protection). The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560318Z
039560318Z
10:30 AM
CLASS - 2Construction fence / site protectionPENDING

How this recorded summons relates at 2003 East 3 Street, Brooklyn, NY 11223

This page documents one source-linked summons (039560318Z), concerning construction fence / site protection. There is no second December summons in this dataset to connect to it. Check the complete DOB property record separately for earlier or later allegations, open correction items or related agency orders.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39560318Z

Normalized ten-character lookup: 039560318Z (infraction 207)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure, structural framing.

Inspector narrative as preserved in source data

ATOI, I OBSERVED AN ACTIVE 3 STORY STRUCTURE. CONSTRUCTION FENCE INSTALLED ON SITE IS EXPIRED IN VIOLATION OF BC 106.8.2

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2003 East 3 Street, Brooklyn, NY 11223

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure, structural framing. Record-specific inspection detail: Inspector text begins: “ATOI, I OBSERVED AN ACTIVE 3 STORY STRUCTURE. CONSTRUCTION FENCE INSTALLED ON SITE IS EXPIRED IN VIOLATION OF BC 106.8.2”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560318Z.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • approved framing plans and structural engineer assessment
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560318Z, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 2003 East 3 Street, Brooklyn, NY 11223
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 2003 East 3 Street, Brooklyn, NY 11223 — not just the summons number

For this property, start with construction fence / site protection. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.

What to send for an assessment: Bring the original summons, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.