NYC DOB / ECB / OATH hearings · verified property resolution

209-56 112 Avenue, Queens, NY 11429 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 209-56 112 Avenue, Queens, NY 11429 and source-listed date December 22, 2026. Recorded concerns include stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
209-56 112 Avenue, Queens, NY 11429
Borough
Queens
BIN
4239834
BBL
4111250046
Source summonses
2
Hearing dates in source
December 22, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 209-56 112 AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 209-56 112 Avenue, Queens, NY 11429?

The uploaded record lists 2 summonses, including 039198446Y (stop-work order / continued work), 039200984L (stop-work order / continued work). The source-listed hearing date: December 22, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39198446Y
039198446Y
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39200984L
039200984L
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 2 recorded summonses relate at 209-56 112 Avenue, Queens, NY 11429

The verified property matching links 2 distinct summonses to 209-56 112 Avenue, Queens, NY 11429. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (2): source summons 039198446Y, 039200984L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39198446Y

Normalized ten-character lookup: 039198446Y (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: balcony or terrace.

Inspector narrative as preserved in source data

PSWO AND ECB VIOLATION ISSUED FOR WORK WITHOUT A PERMIT OBSERVED NEW DOORS/WINDOWS/BALCONY AND THE DORMER WAS ENLARGE ALTERATION WITHOUT A PERMIT AT EXPOSURE 1, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
July 30, 2026
Service date
July 30, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 209-56 112 Avenue, Queens, NY 11429

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: balcony or terrace. Record-specific inspection detail: Inspector text begins: “PSWO AND ECB VIOLATION ISSUED FOR WORK WITHOUT A PERMIT OBSERVED NEW DOORS/WINDOWS/BALCONY AND THE DORMER WAS ENLARGE ALTERATION WITHOUT A PERMIT AT EXPOSU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039198446Y.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • balcony/terrace photos, waterproofing or structural records
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039198446Y, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 209-56 112 Avenue, Queens, NY 11429
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39200984L

Normalized ten-character lookup: 039200984L (infraction 1F8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ECB VIOLATION FOR REMOVAL OF STOP WORK ORDER STICKER.FOR VIOLATION#039198446Y.VIOLATION WAS ISSUED ON 07/30/2026., COMPLY WITH CODE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
August 18, 2026
Service date
August 18, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 209-56 112 Avenue, Queens, NY 11429

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ECB VIOLATION FOR REMOVAL OF STOP WORK ORDER STICKER.FOR VIOLATION#039198446Y.VIOLATION WAS ISSUED ON 07/30/2026., COMPLY WITH CODE”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039200984L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039200984L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 209-56 112 Avenue, Queens, NY 11429
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 209-56 112 Avenue, Queens, NY 11429 — not just the summons number

For this property, start with stop-work order / continued work. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 22, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.