21-15 29 Street, Queens, NY 11105 — Unpermitted electrical work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 21-15 29 Street, Queens, NY 11105 and source-listed date December 1, 2026. Recorded concerns include unpermitted electrical work, work without a permit, site safety / construction operations and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Unpermitted electrical workWork without a permitSite safety / construction operationsElectrical safety / service equipmentSidewalk shed / scaffolding
Verified premises, hearing and enforcement snapshot
Verified premises address
21-15 29 Street, Queens, NY 11105
Borough
Queens
BIN
4017703
BBL
4008460030
Source summonses
5
Hearing dates in source
December 1, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 21-15 29 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 21-15 29 Street, Queens, NY 11105?
The uploaded record lists 5 summonses, including 039204999M (unpermitted electrical work), 039205000M (work without a permit), 039204926L (site safety / construction operations), 039204998K (electrical safety / service equipment) and additional tickets. The source-listed hearing date: December 1, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 21-15 29 Street, Queens, NY 11105
The verified property matching links 5 distinct summonses to 21-15 29 Street, Queens, NY 11105. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Electrical safety / service equipment (1): source summons 039204998K. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039205001Y. Check this charge separately, even when its documents can be gathered with other property records.
Site safety / construction operations (1): source summons 039204926L. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039204999M. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039205000M. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 5 summonses list September 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Coordinate licensed-electrical assessment, but distinguish permit history from the asserted equipment safety/maintenance defect.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Unpermitted electrical work — ECB/OATH summons 39204999M
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED ALL NEW ELECTRICAL PANEL AND NEW BX CABLE RAN THROUGHOUT THE ENTIRE BUILDING. AFTER FURTHER INVESTIGATION THERE IN NO ACTIVE ELECTRICAL PERMIT IN DOB NOW. THE UNPERMITTED ELECTRI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 21, 2026
Service date
September 22, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-15 29 Street, Queens, NY 11105
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED ALL NEW ELECTRICAL PANEL AND NEW BX CABLE RAN THROUGHOUT THE ENTIRE BUILDING. AFTER FURTHER INVESTIGATION THERE IN NO ACTIV…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039204999M.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039204999M, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: gas or boiler equipment.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED 2 GAS METERS W/ PIPING REMOVED AND PLACED ON FLOOR. PERMIT (Q01247196) DESCRIPTION MENTIONS ONLY BOILER AND WATER HEATER WORK GAS RE-PIPING ALLOWED NO REMOVAL OF GAS SERVICE TO BE DONE AT PROPERTY. WOR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 21, 2026
Service date
September 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-15 29 Street, Queens, NY 11105
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “OBSERVED 2 GAS METERS W/ PIPING REMOVED AND PLACED ON FLOOR. PERMIT (Q01247196) DESCRIPTION MENTIONS ONLY BOILER AND WATER HEATER WORK GAS RE-PIPING ALLOWE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205000M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed-trade test results and equipment/permit records
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205000M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, UPON REQUEST OF DOB APPROVED DRAWINGS NONE WERE PROVIDED. CONTRACTOR HAS FAILED TO MAINTAIN REQUIRED DOCUMENTATION ON SITE AT ALL TIMES DURING ACTIVE CONSTRUCTION WORK. PARTIAL STOP WORK
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
September 21, 2026
Service date
September 21, 2026
Source severity
CLASS - 1
Source violation type
Site Safety
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-15 29 Street, Queens, NY 11105
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, UPON REQUEST OF DOB APPROVED DRAWINGS NONE WERE PROVIDED. CONTRACTOR HAS FAILED TO MAINTAIN REQUIRED DOCUMENTATION ON SITE AT ALL TI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039204926L.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039204926L, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED LOOSE WIRING THROUGHOUT THE ENTIRE BUILDING IN THE MAIN PANEL, JUNCTION BOXES, AND OUTLET BOXES. THE LOOSE WIRING PRESENTS AN IMMEDIATE HAZARD TO THE WORKERS AND ADJOINING BUILDI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
September 21, 2026
Service date
September 22, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$800.00
Balance field in extract
$800.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-15 29 Street, Queens, NY 11105
Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED LOOSE WIRING THROUGHOUT THE ENTIRE BUILDING IN THE MAIN PANEL, JUNCTION BOXES, AND OUTLET BOXES. THE LOOSE WIRING PRESENTS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039204998K.
Whether the cited component, clearance or unsafe condition existed as described
Whether the equipment met the applicable requirements and was inspected/maintained
Whether the notice identified the correct location and owner responsibility
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
electrical service and panel photographs with location
licensed electrician safety evaluation and invoices
electrical permits, inspections and test reports
equipment specification or maintenance and repair records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039204998K, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION, OBSERVED PIPE SCAFFOLDING, IMPROPERLY ERECTED, IN THE REAR OF THE BUILDING (EXPO 3). THE SCAFFOLDING FAILED TO HAVE PROPER MUD SILLS, BE FULLY PLANKED AND WAS MISSING THE TOE BOARDS,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 21, 2026
Service date
September 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-15 29 Street, Queens, NY 11105
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, OBSERVED PIPE SCAFFOLDING, IMPROPERLY ERECTED, IN THE REAR OF THE BUILDING (EXPO 3). THE SCAFFOLDING FAILED TO HAVE PROPER MUD S…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205001Y.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205001Y, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 21-15 29 Street, Queens, NY 11105 — not just the summons number
For this property, start with unpermitted electrical work and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 1, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.