The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 215 Frost Street, Brooklyn, NY 11211 and source-listed date December 16, 2026. Recorded concerns include site safety / construction operations, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsWork contrary to approved plans

Verified premises, hearing and enforcement snapshot

Verified premises address
215 Frost Street, Brooklyn, NY 11211
Borough
Brooklyn
BIN
3070017
BBL
3028570058
Source summonses
3
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 215 FROST STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 215 Frost Street, Brooklyn, NY 11211?

The uploaded record lists 3 summonses, including 039560280M (site safety / construction operations), 039560281Y (site safety / construction operations), 039560279P (work contrary to approved plans). The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560280M
039560280M
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39560281Y
039560281Y
9:30 AM
CLASS - 1Site safety / construction operationsPENDING
39560279P
039560279P
10:30 AM
CLASS - 2Work contrary to approved plansPENDING

How the 3 recorded summonses relate at 215 Frost Street, Brooklyn, NY 11211

The verified property matching links 3 distinct summonses to 215 Frost Street, Brooklyn, NY 11211. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (2): source summons 039560280M, 039560281Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work contrary to approved plans (1): source summons 039560279P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list October 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560280M

Normalized ten-character lookup: 039560280M (infraction 2F7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION OF ACTIVE SUPPORT OF EXCAVATION/FOUNDATION JOB SITE UPON ASKING COMPETENT PERSON FOR PRE CONSTRUCTION SURVEY AND MONITORING REPORTS(AS REQUIRED PER APPROVED PLANS/CODE)-NONE WERE PR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 215 Frost Street, Brooklyn, NY 11211

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF ACTIVE SUPPORT OF EXCAVATION/FOUNDATION JOB SITE UPON ASKING COMPETENT PERSON FOR PRE CONSTRUCTION SURVEY AND MONITORING RE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560280M.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560280M, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 215 Frost Street, Brooklyn, NY 11211
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560281Y

Normalized ten-character lookup: 039560281Y (infraction 111)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION I OBSERVED ACTIVE SUPPORT OF EXCAVATION/FOUNDATION STAGE JOB SITE,AS PER PLAN- EXCAVATION TO BE DONE 11 FEET DEEP(PILES /SUPPORT OF EXCAVATION IN PLACE) NOW AT 7 FEET DEEP STAGE -UP

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 111 — BC 3304.3,1 RCNY 52-01(A) FAIL TO NOTIFYDOB PRIOR TO COMMENCEMENT OF EARTHWORK
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 215 Frost Street, Brooklyn, NY 11211

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION I OBSERVED ACTIVE SUPPORT OF EXCAVATION/FOUNDATION STAGE JOB SITE,AS PER PLAN- EXCAVATION TO BE DONE 11 FEET DEEP(PILES /SUPPO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560281Y.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560281Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 215 Frost Street, Brooklyn, NY 11211
Summons 3 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560279P

Normalized ten-character lookup: 039560279P (infraction 282)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

I OBSERVED SUPPORT OF EXCAVATION AT EXP#4 INSTALLED CONTRARY TO PLANS-AS PER PLAN LAGGING SHALL BE SUPPORTED ON PILES/OR INSTALLED ON SIDE/REAR ANGLES -OBSERVED MISSING ANGLE SUPPORTS ON 1 SIDE OF PILES(ANGLES

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 215 Frost Street, Brooklyn, NY 11211

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “I OBSERVED SUPPORT OF EXCAVATION AT EXP#4 INSTALLED CONTRARY TO PLANS-AS PER PLAN LAGGING SHALL BE SUPPORTED ON PILES/OR INSTALLED ON SIDE/REAR ANGLES -OBS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560279P.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560279P, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 215 Frost Street, Brooklyn, NY 11211
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 215 Frost Street, Brooklyn, NY 11211 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.