219 Bushwick Avenue, Brooklyn, NY 11206 — Unsafe condition / maintenance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 219 Bushwick Avenue, Brooklyn, NY 11206 and source-listed date December 9, 2026. Recorded concerns include unsafe condition / maintenance, fire escape / exit obstruction. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Verified premises, hearing and enforcement snapshot
Verified premises address
219 Bushwick Avenue, Brooklyn, NY 11206
Borough
Brooklyn
BIN
3071173
BBL
3030550003
Source summonses
2
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 219 through 223 BUSHWICK AVENUE; 224 through 232 MESEROLE STREET
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 219 Bushwick Avenue, Brooklyn, NY 11206?
The uploaded record lists 2 summonses, including 039206240X (unsafe condition / maintenance), 039206241H (fire escape / exit obstruction). The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 219 Bushwick Avenue, Brooklyn, NY 11206
The verified property matching links 2 distinct summonses to 219 Bushwick Avenue, Brooklyn, NY 11206. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Fire escape / exit obstruction (1): source summons 039206241H. Check this charge separately, even when its documents can be gathered with other property records.
Unsafe condition / maintenance (1): source summons 039206240X. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list October 1, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: front exposure, windows.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION, A VERTICAL STEP CRACK WAS OBSERVED ALONG EXPOSURE #1 (FRONT) OF THE PROPERTY. ADDITIONALLY, MULTIPLE WINDOW AIR-CONDITIONING UNITS WERE OBSERVED INSTALLED WITHOUT PROPER SUPPORT BRACK
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 1, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 219 Bushwick Avenue, Brooklyn, NY 11206
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: front exposure, windows. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, A VERTICAL STEP CRACK WAS OBSERVED ALONG EXPOSURE #1 (FRONT) OF THE PROPERTY. ADDITIONALLY, MULTIPLE WINDOW AIR-CONDITIONING UNI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206240X.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
window photographs and approved facade or window work plans
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206240X, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: fire escape, door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OBSERVED EMERGENCY EXIT PASSAGEWAY PARTIALLY OBSTRUCTED WITH GARBAGE PAILS, DEBRIS AND METAL DRUMS ON EXPOSURE # 02. ALSO OBSERVED STORAGE UNDER THE FIRE ESCAPE DROP LADDER.,, REMOVE OBSTR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
Issue date
October 1, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 219 Bushwick Avenue, Brooklyn, NY 11206
Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: fire escape, door or exit route. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED EMERGENCY EXIT PASSAGEWAY PARTIALLY OBSTRUCTED WITH GARBAGE PAILS, DEBRIS AND METAL DRUMS ON EXPOSURE # 02. ALSO OBSERVED ST…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206241H.
Whether the cited route is a required exit component for this occupancy
Whether the alleged objects, locks or configuration actually affected required egress at the cited location
Whether the area and date are accurately identified and whether correction can be documented
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Remove hazards and restore required safe egress immediately.
When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
photos of the cited fire escape and relevant inspection or repair reports
door/exit photographs and approved egress plans
photographs of the exact door, stair, hall, landing or fire escape
approved floor and means-of-egress plans
repair/removal invoices and dated completion photographs
fire-escape or professional inspection and compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206241H, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 219 Bushwick Avenue, Brooklyn, NY 11206 — not just the summons number
For this property, start with unsafe condition / maintenance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.