Certificate of Correction / order noncompliance — ECB/OATH summons 39209018Z
Normalized ten-character lookup: 039209018Z (infraction 263)
Source allegation and actual cited law
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. Key locations/components named in the source: cellar or basement area.
Inspector narrative as preserved in source data — potentially incomplete
NO ACCESS, NO CERTIFICATE OF CORRECTIONS ON FILE FOR CLASS 1 WORK WITHOUT PERMIT VIOLATION #39092836Y ISSUED ON 8/18/2023 FOR CELLAR LEVEL LAUNDRY ROOM W/6 DRYERS/WASHING MACHINES WITH ILLEGAL WASTE AND WATER L
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
- Issue date
- October 22, 2026
- Service date
- October 22, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 22 East 105 Street, Manhattan, NY 10029
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “NO ACCESS, NO CERTIFICATE OF CORRECTIONS ON FILE FOR CLASS 1 WORK WITHOUT PERMIT VIOLATION #39092836Y ISSUED ON 8/18/2023 FOR CELLAR LEVEL LAUNDRY ROOM W/6…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039209018Z.
- Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
- Whether the prior order references the correct premises and responsible party
- Whether the earlier cited condition has been corrected and what current DOB closeout record shows
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Retrieve the original violation, deadline and agency compliance requirements.
- Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- dated cellar/basement photos and approved basement floor plan
- underlying summons, order and deadline notice
- DOB Certificate of Correction filings and acknowledgments
- before/after dated photographs and signed affidavits where required
- contractor or licensed-professional invoices and sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039209018Z, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
Request help with certificate of correction / order noncompliance at 22 East 105 Street, Manhattan, NY 10029