NYC DOB / ECB / OATH hearings · verified property resolution

232-02 135 Avenue, Queens, NY 11413 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 232-02 135 Avenue, Queens, NY 11413 and source-listed date December 15, 2026. Recorded concerns include stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
232-02 135 Avenue, Queens, NY 11413
Borough
Queens
BIN
4282939
BBL
4131670033
Source summonses
3
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 135-01 232 STREET; 232-02 135 AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 232-02 135 Avenue, Queens, NY 11413?

The uploaded record lists 3 summonses, including 039200674X (stop-work order / continued work), 039200693L (stop-work order / continued work), 039200697Z (stop-work order / continued work). The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39200674X
039200674X
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39200693L
039200693L
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39200697Z
039200697Z
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 3 recorded summonses relate at 232-02 135 Avenue, Queens, NY 11413

The verified property matching links 3 distinct summonses to 232-02 135 Avenue, Queens, NY 11413. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (3): source summons 039200674X, 039200693L, 039200697Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 3 summonses list August 14, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39200674X

Normalized ten-character lookup: 039200674X (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: structural framing, kitchen or bathroom.

Inspector narrative as preserved in source data

PSWO FOR CONSTRUCTION WORK BEING DONE WITHOUT A PERMIT,ATOI OBSERVED WINDOWS WAS REPLACED BY NEW DOORS AT EXPOSURE 1 ALSO KITCHEN STRUCTURE WAS REMOVED, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 14, 2026
Service date
August 14, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 232-02 135 Avenue, Queens, NY 11413

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: structural framing, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “PSWO FOR CONSTRUCTION WORK BEING DONE WITHOUT A PERMIT,ATOI OBSERVED WINDOWS WAS REPLACED BY NEW DOORS AT EXPOSURE 1 ALSO KITCHEN STRUCTURE WAS REMOVED, OB…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039200674X.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • approved wet-room layouts and plumbing/alteration permits
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039200674X, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 232-02 135 Avenue, Queens, NY 11413
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39200693L

Normalized ten-character lookup: 039200693L (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data

PSWO FOR ELECTRICAL WORK WITHOUT A PERMIT ATOI OBSERVED NEW ELECTRICAL LIGHT SWITCHES/CABLE WIRE THROUGHOUT BUILDING, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 14, 2026
Service date
August 14, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 232-02 135 Avenue, Queens, NY 11413

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “PSWO FOR ELECTRICAL WORK WITHOUT A PERMIT ATOI OBSERVED NEW ELECTRICAL LIGHT SWITCHES/CABLE WIRE THROUGHOUT BUILDING, OBTAIN PERMIT”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039200693L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039200693L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 232-02 135 Avenue, Queens, NY 11413
Summons 3 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39200697Z

Normalized ten-character lookup: 039200697Z (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: kitchen or bathroom.

Inspector narrative as preserved in source data

PSWO FOR WORK WITHOUT A PERMIT ATOI OBSERVED NEW PLUMBING PIPE IN THE BATHROOM/KITCHEN, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 14, 2026
Service date
August 14, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 232-02 135 Avenue, Queens, NY 11413

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “PSWO FOR WORK WITHOUT A PERMIT ATOI OBSERVED NEW PLUMBING PIPE IN THE BATHROOM/KITCHEN, OBTAIN PERMIT”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039200697Z.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved wet-room layouts and plumbing/alteration permits
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039200697Z, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 232-02 135 Avenue, Queens, NY 11413
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 232-02 135 Avenue, Queens, NY 11413 — not just the summons number

For this property, start with stop-work order / continued work. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (3 source summonses): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.