Construction fall / overhead protection — ECB/OATH summons 39560403N
Normalized ten-character lookup: 039560403N (infraction 2P5)
Source allegation and actual cited law
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: windows.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED 6 STORY NB ON 2ND FL WORKING FLOOR SUPERSTRUCTURE PHASE. EXPO 2 ADJACENT PROPERTY HAD NO WINDOW PROTECTION INSTALLED TO PROTECT IT FROM FALLING CONSTRUCTION DEBRIS, CONTRARY TO CODE. STOP ALL WORK 10FT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2P5
- Issue date
- October 8, 2026
- Service date
- October 8, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 2320 Belmont Avenue, Bronx, NY 10458
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: windows. Record-specific inspection detail: Inspector text begins: “OBSERVED 6 STORY NB ON 2ND FL WORKING FLOOR SUPERSTRUCTURE PHASE. EXPO 2 ADJACENT PROPERTY HAD NO WINDOW PROTECTION INSTALLED TO PROTECT IT FROM FALLING CO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560403N.
- Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
- Whether engineered protection drawings and installation records cover the cited area
- Whether the cited work phase or affected neighboring area is accurately identified
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
- Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- window photographs and approved facade or window work plans
- site safety plan and engineered protection details
- dated photographs tied to the specific exposure and floor
- guardrail, netting or overhead-cover installation and inspection records
- contractor corrective work logs and any adjacent-property access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.