Construction fence / site protection — ECB/OATH summons 39559750J
Normalized ten-character lookup: 039559750J (infraction 2P7)
Source allegation and actual cited law
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: roof or rooftop, construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
BC 3303.3 AT THE TIME OF MY INSPECTION OF A 13-STORY NEW BUILDING AT ROOF, BUILDING APPROXIMATELY 7275 SQUARE FEET. SITE CLOSED, NO CONSTRUCTION ACTIVITIES. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE & DOO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2P7
- Issue date
- September 26, 2026
- Service date
- September 26, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 236 Gold Street, Brooklyn, NY 11201
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: roof or rooftop, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “BC 3303.3 AT THE TIME OF MY INSPECTION OF A 13-STORY NEW BUILDING AT ROOF, BUILDING APPROXIMATELY 7275 SQUARE FEET. SITE CLOSED, NO CONSTRUCTION ACTIVITIES…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559750J.
- Whether the cited condition existed at the exact exposure or location alleged
- Whether the protection system and permit met the requirements applicable to this site
- Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Address unsafe public access or exposed hazards immediately.
- Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- dated roof photographs and any roofing/equipment permit documents
- site-fence photos, dimensions and inspection log
- site safety or construction fence drawings/permits
- dated photographs showing the cited exposure and dimensions
- daily inspection logs and contractor repair tickets
- documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559750J, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
Request help with construction fence / site protection at 236 Gold Street, Brooklyn, NY 11201