Filing, inspection or permit administration — ECB/OATH summons 39206914N
Normalized ten-character lookup: 039206914N (infraction 2G1)
Source allegation and actual cited law
The record alleges a missing, expired, incomplete or improperly documented DOB filing, permit or inspection. Key locations/components named in the source: signage.
Inspector narrative as preserved in source data
FAILURE TO SIGN OFF ON PERMITTED WORK. NOTED JOBS # 52 0238633, AND 5200258471, PERMITTED ON 01/30/2016 AND 12/30/2015 RESPECTIVELY HAS NOT BEEN SIGNED OFF ., CONDUCT/FILE FINAL INSPECTION
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 2G1 — 28-116.2.4.2 FAIL TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEP
- Issue date
- October 6, 2026
- Service date
- October 6, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 242 Wellbrook Avenue, Staten Island, NY 10314
Identify the job number, document, inspection or filing cycle and confirm the operative due date and recorded acceptance status. Key locations/components named in the source: signage. Record-specific inspection detail: Inspector text begins: “FAILURE TO SIGN OFF ON PERMITTED WORK. NOTED JOBS # 52 0238633, AND 5200258471, PERMITTED ON 01/30/2016 AND 12/30/2015 RESPECTIVELY HAS NOT BEEN SIGNED OFF…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206914N.
- Whether the relevant document or inspection was in fact required
- Whether it was filed, renewed or approved before the applicable deadline
- Whether the cited job, permit, premises and responsible applicant are correct
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Obtain the correct accepted agency filing or schedule a required inspection.
- Resolve rejected or incomplete submissions and obtain documentary DOB acceptance or closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- sign permit and dimensions/location photographs
- DOB job/permit history, application and renewal records
- filing confirmation, rejection/approval and payment receipts
- inspection scheduling and result records
- professional or applicant-of-record correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.