NYC DOB / ECB / OATH hearings · verified property resolution

2420 Broadway, Manhattan, NY 10024 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 2420 Broadway, Manhattan, NY 10024 and source-listed date December 3, 2026. Recorded concerns include site safety / construction operations, tenant protection plan / safeguards. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsTenant protection plan / safeguards

Verified premises, hearing and enforcement snapshot

Verified premises address
2420 Broadway, Manhattan, NY 10024
Borough
Manhattan
BIN
1033308
BBL
1012370017
Source summonses
4
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 205 through 217 WEST 89 STREET; 206 through 212 WEST 90 STREET; 2420 through 2438 BROADWAY

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 2420 Broadway, Manhattan, NY 10024?

The uploaded record lists 4 summonses, including 039002928J (site safety / construction operations), 039002929L (tenant protection plan / safeguards), 039002930Z (tenant protection plan / safeguards), 039002931K (site safety / construction operations). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39002928J
039002928J
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39002929L
039002929L
8:30 AM
CLASS - 2Tenant protection plan / safeguardsPENDING
39002930Z
039002930Z
8:30 AM
CLASS - 2Tenant protection plan / safeguardsPENDING
39002931K
039002931K
8:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 4 recorded summonses relate at 2420 Broadway, Manhattan, NY 10024

The verified property matching links 4 distinct summonses to 2420 Broadway, Manhattan, NY 10024. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (2): source summons 039002928J, 039002931K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Tenant protection plan / safeguards (2): source summons 039002929L, 039002930Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 4 summonses list May 14, 2019 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39002928J

Normalized ten-character lookup: 039002928J (infraction 2K8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO POST SAFE CONSTRUCTION BILL OF RIGHTS: NOTED: AT TIME OF INSPECTION CONDUCTED A WALK-THROUGH OF THE BUILDING. CONSTRUCTION WORK ONGOING IN APT 3I UNDER PERMIT #140822457. I DID NOT OBSERVE A SAFE CO

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2K8 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS"
Issue date
May 14, 2019
Service date
May 14, 2019
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,889.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2420 Broadway, Manhattan, NY 10024

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “FAILURE TO POST SAFE CONSTRUCTION BILL OF RIGHTS: NOTED: AT TIME OF INSPECTION CONDUCTED A WALK-THROUGH OF THE BUILDING. CONSTRUCTION WORK ONGOING IN APT 3…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039002928J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039002928J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2420 Broadway, Manhattan, NY 10024
Summons 2 of the source-linked property

Tenant protection plan / safeguards — ECB/OATH summons 39002929L

Normalized ten-character lookup: 039002929L (infraction 2K7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation concerns a missing tenant protection plan, posted notice or safeguards during construction in an occupied building. Key locations/components named in the source: apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO POST NOTICE OF TENANT PROTECTION PLAN: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 2H UNDER PERMIT #123467667. CONDUCTED A WALK-THROUGH OF THE BUILDING. I DID NOT OBSERVE A TENANT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2K7 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE NOTICE OF TPP
Issue date
May 14, 2019
Service date
May 14, 2019
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2420 Broadway, Manhattan, NY 10024

Identify the occupied floors/units, the actual DOB filing and posting requirements, and whether the described work created an affected tenant-protection obligation. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “FAILURE TO POST NOTICE OF TENANT PROTECTION PLAN: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 2H UNDER PERMIT #123467667. CONDUCTED A WA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039002929L.

  • Whether the alleged work and occupancy triggered the specified tenant protection requirement
  • Whether a compliant plan was filed, available and properly posted before the cited inspection
  • Whether the cited site/units and posting locations were accurately documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Provide required tenant protections immediately and coordinate with the permitted job team.
  • File or correct the tenant protection plan and notices as applicable and document posting, access and agency acknowledgment.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • DOB tenant protection plan and filing history
  • dated photographs of required notice postings
  • tenant protection inspection and daily work logs
  • job plans, permit scope and evidence of occupied units

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039002929L, Building Violation LLC can scope tenant-protection-plan and occupied-building compliance review after reviewing the actual notice and current DOB/OATH record.

Request help with tenant protection plan / safeguards at 2420 Broadway, Manhattan, NY 10024
Summons 3 of the source-linked property

Tenant protection plan / safeguards — ECB/OATH summons 39002930Z

Normalized ten-character lookup: 039002930Z (infraction 2K7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation concerns a missing tenant protection plan, posted notice or safeguards during construction in an occupied building. Key locations/components named in the source: apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO POST NOTICE OF TENANT PROTECTION PLAN: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 3I UNDER PERMIT #140822457. CONDUCTED A WALK-THROUGH OF THE BUILDING. I DID NOT OBSERVE A TENANT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2K7 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE NOTICE OF TPP
Issue date
May 14, 2019
Service date
May 14, 2019
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2420 Broadway, Manhattan, NY 10024

Identify the occupied floors/units, the actual DOB filing and posting requirements, and whether the described work created an affected tenant-protection obligation. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “FAILURE TO POST NOTICE OF TENANT PROTECTION PLAN: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 3I UNDER PERMIT #140822457. CONDUCTED A WA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039002930Z.

  • Whether the alleged work and occupancy triggered the specified tenant protection requirement
  • Whether a compliant plan was filed, available and properly posted before the cited inspection
  • Whether the cited site/units and posting locations were accurately documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Provide required tenant protections immediately and coordinate with the permitted job team.
  • File or correct the tenant protection plan and notices as applicable and document posting, access and agency acknowledgment.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • DOB tenant protection plan and filing history
  • dated photographs of required notice postings
  • tenant protection inspection and daily work logs
  • job plans, permit scope and evidence of occupied units

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039002930Z, Building Violation LLC can scope tenant-protection-plan and occupied-building compliance review after reviewing the actual notice and current DOB/OATH record.

Request help with tenant protection plan / safeguards at 2420 Broadway, Manhattan, NY 10024
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39002931K

Normalized ten-character lookup: 039002931K (infraction 2K8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO POST SAFE CONSTRUCTION BILL OF RIGHTS: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 2H UNDER PERMIT #123467667. CONDUCTED A WALK-THROUGH OF THE BUILDING. I DID NOT OBSERVE A SAFE CO

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2K8 — 27-2009.2 FAILURE TO POST OR DISTRIBUTE "SAFE CONSTRUCTION BILL OF RIGHTS"
Issue date
May 14, 2019
Service date
May 14, 2019
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2420 Broadway, Manhattan, NY 10024

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “FAILURE TO POST SAFE CONSTRUCTION BILL OF RIGHTS: NOTED: AT TIME OF INSPECTION OBSERVED CONSTRUCTION WORK IN APT 2H UNDER PERMIT #123467667. CONDUCTED A WA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039002931K.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039002931K, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2420 Broadway, Manhattan, NY 10024
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 2420 Broadway, Manhattan, NY 10024 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Tenant protection plan / safeguards (2 source summonses): Tenant-protection-plan and occupied-building compliance review.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.