NYC DOB / ECB / OATH hearings · verified property resolution

247 West 136 Street, Manhattan, NY 10030 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 247 West 136 Street, Manhattan, NY 10030 and source-listed dates December 3, 2026, December 17, 2026, December 24, 2026. Recorded concerns include stop-work order / continued work, construction fence / site protection, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued workConstruction fence / site protectionSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
247 West 136 Street, Manhattan, NY 10030
Borough
Manhattan
BIN
1058986
BBL
1019420112
Source summonses
4
Hearing dates in source
December 3, 2026, December 17, 2026, December 24, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 247 WEST 136 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 247 West 136 Street, Manhattan, NY 10030?

The uploaded record lists 4 summonses, including 039205327Y (construction fence / site protection), 039205328X (site safety / construction operations), 039207127Z (stop-work order / continued work), 039208219K (stop-work order / continued work). The source-listed hearing dates: December 3, 2026, December 17, 2026, December 24, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39205327Y
039205327Y
9:30 AM
CLASS - 2Construction fence / site protectionPENDING
39205328X
039205328X
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39207127Z
039207127Z
9:30 AM
CLASS - 1Stop-work order / continued workPENDING
39208219K
039208219K
10:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 4 recorded summonses relate at 247 West 136 Street, Manhattan, NY 10030

The verified property matching links 4 distinct summonses to 247 West 136 Street, Manhattan, NY 10030. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (2): source summons 039207127Z, 039208219K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fence / site protection (1): source summons 039205327Y. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039205328X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 23, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 3, 2026, December 17, 2026, December 24, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39205327Y

Normalized ten-character lookup: 039205327Y (infraction 211)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.

Inspector narrative as preserved in source data

ATOI, OBSERVED VIEWING PANELS ON CONSTRUCTION FENCE COVERED WITH BLACK PLASTIC., COMPLY WITH CODE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 247 West 136 Street, Manhattan, NY 10030

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED VIEWING PANELS ON CONSTRUCTION FENCE COVERED WITH BLACK PLASTIC., COMPLY WITH CODE”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205327Y.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205327Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 247 West 136 Street, Manhattan, NY 10030
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39205328X

Normalized ten-character lookup: 039205328X (infraction 2A7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ATOI, PERSON WHO IDENTIFIED AS GENERAL CONTRACTOR REFUSED AND DENIED ENTRY INTO SITE., PROVIDE ACCESS AND/OR EXPOSURE TO ONGOING CONSTRUCTION OR WORK

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 247 West 136 Street, Manhattan, NY 10030

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI, PERSON WHO IDENTIFIED AS GENERAL CONTRACTOR REFUSED AND DENIED ENTRY INTO SITE., PROVIDE ACCESS AND/OR EXPOSURE TO ONGOING CONSTRUCTION OR WORK”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205328X.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205328X, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 247 West 136 Street, Manhattan, NY 10030
Summons 3 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39207127Z

Normalized ten-character lookup: 039207127Z (infraction 1F8)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ATOI, OBSERVED FULL STOP WORK ORDER STICKER THAT WAS ISSUED ON 9/23/2026, HAS BEEN REMOVED., COMPLY WITH CODE; DO NOT REMOVE STICKER

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 247 West 136 Street, Manhattan, NY 10030

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED FULL STOP WORK ORDER STICKER THAT WAS ISSUED ON 9/23/2026, HAS BEEN REMOVED., COMPLY WITH CODE; DO NOT REMOVE STICKER”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207127Z.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207127Z, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 247 West 136 Street, Manhattan, NY 10030
Summons 4 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39208219K

Normalized ten-character lookup: 039208219K (infraction 1F8)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

OBSERVED THAT FULL SWO STICKER THAT WAS REPOSTED ON 10/07/2026 FOR THE FULL SWO ISSUED ON 9/23/2026, HAS BEEN REMOVED., COMPLY WITH CODE; DO NOT REMOVE STICKER

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
October 16, 2026
Service date
October 16, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 247 West 136 Street, Manhattan, NY 10030

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED THAT FULL SWO STICKER THAT WAS REPOSTED ON 10/07/2026 FOR THE FULL SWO ISSUED ON 9/23/2026, HAS BEEN REMOVED., COMPLY WITH CODE; DO NOT REMOVE STI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208219K.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208219K, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 247 West 136 Street, Manhattan, NY 10030
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 247 West 136 Street, Manhattan, NY 10030 — not just the summons number

For this property, start with stop-work order / continued work and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 17, 2026, December 24, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.