249 Withers Street, Brooklyn, NY 11211 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 249 Withers Street, Brooklyn, NY 11211 and source-listed dates December 3, 2026, December 11, 2026. Recorded concerns include site safety / construction operations, sidewalk shed / scaffolding, excavation / adjoining property protection and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsSidewalk shed / scaffoldingExcavation / adjoining property protectionJobsite fire extinguishers

Verified premises, hearing and enforcement snapshot

Verified premises address
249 Withers Street, Brooklyn, NY 11211
Borough
Brooklyn
BIN
3070064
BBL
3028660056
Source summonses
6
Hearing dates in source
December 3, 2026, December 11, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 249 Withers Street, Brooklyn, NY 11211?

The uploaded record lists 6 summonses, including 039550554L (site safety / construction operations), 039550555N (site safety / construction operations), 039550557R (excavation / adjoining property protection), 039550562L (jobsite fire extinguishers) and additional tickets. The source-listed hearing dates: December 3, 2026, December 11, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39550554L
039550554L
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39550555N
039550555N
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39550557R
039550557R
8:30 AM
CLASS - 2Excavation / adjoining property protectionPENDING
39550562L
039550562L
8:30 AM
CLASS - 2Jobsite fire extinguishersPENDING
39550565R
039550565R
8:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
35729971R
035729971R
8:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 6 recorded summonses relate at 249 Withers Street, Brooklyn, NY 11211

The verified property matching links 6 distinct summonses to 249 Withers Street, Brooklyn, NY 11211. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (2): source summons 039550565R, 035729971R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Site safety / construction operations (2): source summons 039550554L, 039550555N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Excavation / adjoining property protection (1): source summons 039550557R. Check this charge separately, even when its documents can be gathered with other property records.

Jobsite fire extinguishers (1): source summons 039550562L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 5 summonses list February 19, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 3, 2026, December 11, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39550554L

Normalized ten-character lookup: 039550554L (infraction 1F2)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION OF ACTIVE JOB SITE-UPON ASKING FOR SITE SAFETY PLAN-NONE PROVIDED AND CONSTRUCTION SUPER LOG BOOK-LAST ENTRY 12/22/25,PRESHIFT MEETING LOOG BOOK LAST ENTRY ON 11/25/25,NO MAINT LOG

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
February 19, 2026
Service date
February 19, 2026
Source severity
CLASS - 1
Source violation type
Site Safety
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF ACTIVE JOB SITE-UPON ASKING FOR SITE SAFETY PLAN-NONE PROVIDED AND CONSTRUCTION SUPER LOG BOOK-LAST ENTRY 12/22/25,PRESHIFT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039550554L.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039550554L, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 249 Withers Street, Brooklyn, NY 11211
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39550555N

Normalized ten-character lookup: 039550555N (infraction 2F7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION OBSERVED INSTALLED COLD FORM STEEL -UPON ASKING COMPETENT PERSON FOR INSTALLATION DRAWINGS, MANUFACTURERS SPECS, SPECIAL INSPECTION ,TECHNICAL REPORTS-NONE WERE PROVIDED-STOP ALL IN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
February 19, 2026
Service date
February 19, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OBSERVED INSTALLED COLD FORM STEEL -UPON ASKING COMPETENT PERSON FOR INSTALLATION DRAWINGS, MANUFACTURERS SPECS, SPECIAL INSPE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039550555N.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039550555N, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 249 Withers Street, Brooklyn, NY 11211
Summons 3 of the source-linked property

Excavation / adjoining property protection — ECB/OATH summons 39550557R

Normalized ten-character lookup: 039550557R (infraction 2P3)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The source alleges excavation, foundation or adjacent-property protective measures were insufficient. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION OBSERVED MISSING ADJ PROPERTY PROTECTION AT CORNERS OF EXP#3/2 AND 3/4-WHILE WORK IS NOT COMPLETE-AT EXP#2 PLASTIC AWNING NOT PROTECTED-AT EXP#4 ROOF/SETBACKS NOT PROTECTED AS REQUI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P3
Issue date
February 19, 2026
Service date
February 19, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Establish the exact excavation depth, exposure, neighboring property and safety/protection obligation cited; any structural danger needs prompt professional attention. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OBSERVED MISSING ADJ PROPERTY PROTECTION AT CORNERS OF EXP#3/2 AND 3/4-WHILE WORK IS NOT COMPLETE-AT EXP#2 PLASTIC AWNING NOT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039550557R.

  • Whether adjoining-property or excavation protective work was required in the specific conditions observed
  • Whether approved engineering documents and installed protection met the relevant requirements
  • Whether measurements, construction phase and cited neighboring premises are correctly identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Immediately evaluate active excavation or neighboring-building hazards using qualified contractors and design professionals.
  • Review approved plans, survey/monitoring obligations and required protection measures, then document correction and any DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • excavation support, underpinning and protection plans
  • geotechnical or structural engineer field reports and monitoring data
  • survey and adjoining-property condition documentation
  • dated excavation photos, contractor logs and DOB approvals

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039550557R, Building Violation LLC can scope excavation and adjoining-property protection hearing-evidence review after reviewing the actual notice and current DOB/OATH record.

Request help with excavation / adjoining property protection at 249 Withers Street, Brooklyn, NY 11211
Summons 4 of the source-linked property

Jobsite fire extinguishers — ECB/OATH summons 39550562L

Normalized ten-character lookup: 039550562L (infraction 2N6)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The inspector alleges absent, expired, inaccessible or otherwise deficient portable fire extinguishers at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF MY INSPECTION OF ACTIVE 4 STORY NEW BUILDING OBSERVED INADEQUATE FIRE EXTINGUISHERS ON SITE-SMALL SIZE-1 OF FIRE EXTINGUISHER DIAL SHOWED EMPTY-OTHER FIRE EXTINGUISHER DIAL BROKEN/FALLING OFF/NOT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2N6
Issue date
February 19, 2026
Service date
February 19, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$625.00
Balance field in extract
$625.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Check the actual site locations, number, condition, inspection tags and accessibility of extinguishers on the inspection date. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF MY INSPECTION OF ACTIVE 4 STORY NEW BUILDING OBSERVED INADEQUATE FIRE EXTINGUISHERS ON SITE-SMALL SIZE-1 OF FIRE EXTINGUISHER DIAL SHOWED EM…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039550562L.

  • Whether the cited extinguishers were present and properly inspected at the time alleged
  • Whether the inspector identified the correct site or phase of work
  • Whether contemporaneous extinguisher service or inspection records document compliance
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Supply, inspect or replace required fire extinguishers promptly and maintain accessible placement.
  • Retain service tags, logs and dated post-correction photos; verify whether formal DOB certification or OATH hearing response is required.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated extinguisher location photographs and inspection tags
  • service vendor logs, receipts and replacement invoices
  • site fire-protection plan and daily inspection records
  • original summons and photos attached by inspector

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039550562L, Building Violation LLC can scope site fire-extinguisher compliance research and hearing-evidence coordination after reviewing the actual notice and current DOB/OATH record.

Request help with jobsite fire extinguishers at 249 Withers Street, Brooklyn, NY 11211
Summons 5 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39550565R

Normalized ten-character lookup: 039550565R (infraction 2G5)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED MULTIPLE VIOLATING CONDITIONS -WORK WITHOUT PERMIT(SUPPORTED SCAFFOLD ,OVERHEAD PROTECTION),NO ADJ PROPERTY PROTECTION,INADEQUATE FIRE EXTUINGUISHERS,NO DOCUMENTS ON SITE/SUPER LOG,SITE SAFETY PLA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.
Issue date
February 19, 2026
Service date
February 19, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED MULTIPLE VIOLATING CONDITIONS -WORK WITHOUT PERMIT(SUPPORTED SCAFFOLD ,OVERHEAD PROTECTION),NO ADJ PROPERTY PROTECTION,INADEQUATE FIRE EXTUIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039550565R.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039550565R, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 249 Withers Street, Brooklyn, NY 11211
Summons 6 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 35729971R

Normalized ten-character lookup: 035729971R (infraction 2P8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data — potentially incomplete

TEMPORARY CONSTRUCTION EQUIP/INSTALLATION ON-SITE EXPIRED PERMIT "SIDEWALK SHED". AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE OF A PROPOSED 4 STORY BUILDING WAS CLOSED. OBSERVED CONSTRUCTION TEMPORARY EQU

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P8
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 249 Withers Street, Brooklyn, NY 11211

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “TEMPORARY CONSTRUCTION EQUIP/INSTALLATION ON-SITE EXPIRED PERMIT "SIDEWALK SHED". AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE OF A PROPOSED 4 STORY B…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035729971R.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035729971R, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 249 Withers Street, Brooklyn, NY 11211
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 249 Withers Street, Brooklyn, NY 11211 — not just the summons number

For this property, start with site safety / construction operations and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Excavation / adjoining property protection (1 source summons): Excavation and adjoining-property protection hearing-evidence review.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 11, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.