NYC DOB / ECB / OATH hearings · verified property resolution

25-08 43 Avenue, Queens, NY 11101 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 25-08 43 Avenue, Queens, NY 11101 and source-listed dates December 1, 2026, December 8, 2026. Recorded concerns include site safety / construction operations, elevator / hoist compliance, work contrary to approved plans and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsElevator / hoist complianceWork contrary to approved plansCertificate of Correction / order noncompliance

Verified premises, hearing and enforcement snapshot

Verified premises address
25-08 43 Avenue, Queens, NY 11101
Borough
Queens
BIN
4625285
BBL
4004340008
Source summonses
6
Hearing dates in source
December 1, 2026, December 8, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 25-08 43 Avenue, Queens, NY 11101?

The uploaded record lists 6 summonses, including 039556527N (elevator / hoist compliance), 039556528P (site safety / construction operations), 039556529R (site safety / construction operations), 039556530Y (site safety / construction operations) and additional tickets. The source-listed hearing dates: December 1, 2026, December 8, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39556527N
039556527N
8:30 AM
CLASS - 1Elevator / hoist compliancePENDING
39556528P
039556528P
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39556529R
039556529R
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39556530Y
039556530Y
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39556531X
039556531X
8:30 AM
CLASS - 1Work contrary to approved plansPENDING
39559075P
039559075P
8:30 AM
CLASS - 2Certificate of Correction / order noncompliancePENDING

How the 6 recorded summonses relate at 25-08 43 Avenue, Queens, NY 11101

The verified property matching links 6 distinct summonses to 25-08 43 Avenue, Queens, NY 11101. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (3): source summons 039556528P, 039556529R, 039556530Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Certificate of Correction / order noncompliance (1): source summons 039559075P. Check this charge separately, even when its documents can be gathered with other property records.

Elevator / hoist compliance (1): source summons 039556527N. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039556531X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 5 summonses list July 13, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 1, 2026, December 8, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Elevator / hoist compliance — ECB/OATH summons 39556527N

Normalized ten-character lookup: 039556527N (infraction 1N6)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation addresses elevators, hoists or related tests, maintenance or safety obligations. Key locations/components named in the source: stairs or landings, elevator or lift.

Inspector narrative as preserved in source data — potentially incomplete

@9STORY NB SITE OBSERVE FIRE EXTINGUISHERS THROUGHOUT FLOORS&AREAS MISSING SIGNAGES, NOT HUNG/ELEVATED OFF FLOORS, NOT IN PLACE BY STAIRS&/OR MISSING, NOT BY TEMPORARY ELEVATOR WHERE COMBUSTIBLE MATERIAL&DEBRIS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1N6
Issue date
July 13, 2026
Service date
July 13, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Identify the numbered device and exact testing, inspection, permit or safety defect cited; compare it with the equipment history. Key locations/components named in the source: stairs or landings, elevator or lift. Record-specific inspection detail: Inspector text begins: “@9STORY NB SITE OBSERVE FIRE EXTINGUISHERS THROUGHOUT FLOORS&AREAS MISSING SIGNAGES, NOT HUNG/ELEVATED OFF FLOORS, NOT IN PLACE BY STAIRS&/OR MISSING, NOT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039556527N.

  • Whether the cited device and required reporting/inspection period are correct
  • Whether testing, inspection or corrections had been completed and accepted by the relevant date
  • Whether the record confuses a different device or reporting cycle
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address active safety hazards and arrange licensed elevator/hoist contractor inspection.
  • Complete applicable DOB filings, tests, repairs, permits and final sign-offs.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • device inspection and service documentation
  • device-number identification and DOB inspection history
  • elevator maintenance logs and test filings
  • licensed contractor inspection, work and correction records
  • dated photos and DOB acceptance documentation

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039556527N, Building Violation LLC can scope elevator/hoist hearing response and device-record coordination after reviewing the actual notice and current DOB/OATH record.

Request help with elevator / hoist compliance at 25-08 43 Avenue, Queens, NY 11101
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39556528P

Normalized ten-character lookup: 039556528P (infraction 106)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

28-105.12.8 WORK NOT ADHERE TO SITE SAFETY PLAN.@9STORY NB SITE@119'H OBSERVE EXP#3 NEIGHBOR 1STORY PROPERTY(43-15 CRESCENT ST)ROOF PROTECTION NOT IN PLACE TO PROVIDED SITE SAFETY PLAN&FAIL TO COMPLY WITH BC330

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
Issue date
July 13, 2026
Service date
July 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “28-105.12.8 WORK NOT ADHERE TO SITE SAFETY PLAN.@9STORY NB SITE@119'H OBSERVE EXP#3 NEIGHBOR 1STORY PROPERTY(43-15 CRESCENT ST)ROOF PROTECTION NOT IN PLACE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039556528P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039556528P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 25-08 43 Avenue, Queens, NY 11101
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39556529R

Normalized ten-character lookup: 039556529R (infraction 115)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

+VERTICAL SAFETY NETTING.@9STORY NB SITE OBSERVE GUARDRAIL SYSTEM THROUGHOUT FLOORS&VERTICAL SAFETY NETTING SYSTEM@EXTERIOR PERIMETER NOT IN PLACE&/OR MAINTAINED(LOOSE/DAMAGED NET,NO RAIL/CABLE&TOE BOARD)TO COD

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
July 13, 2026
Service date
July 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “+VERTICAL SAFETY NETTING.@9STORY NB SITE OBSERVE GUARDRAIL SYSTEM THROUGHOUT FLOORS&VERTICAL SAFETY NETTING SYSTEM@EXTERIOR PERIMETER NOT IN PLACE&/OR MAIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039556529R.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039556529R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 25-08 43 Avenue, Queens, NY 11101
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39556530Y

Normalized ten-character lookup: 039556530Y (infraction 181)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

@9STORY NB SITE OBSERVE INADEQUATE HOUSEKEEPING TO CODES BC3303.4.4/3303.4.5/3303.4.7/3303.4.10 WITHIN SITE&EXTERIOR PERIMETER+ROOF WITH CONSTRUCTION MATERIAL/DEBRIS/EQUIPMENT CREATING DISLODGEMENT HAZARD& OBST

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
July 13, 2026
Service date
July 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “@9STORY NB SITE OBSERVE INADEQUATE HOUSEKEEPING TO CODES BC3303.4.4/3303.4.5/3303.4.7/3303.4.10 WITHIN SITE&EXTERIOR PERIMETER+ROOF WITH CONSTRUCTION MATER…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039556530Y.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039556530Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 25-08 43 Avenue, Queens, NY 11101
Summons 5 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39556531X

Normalized ten-character lookup: 039556531X (infraction 182)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop, stairs or landings.

Inspector narrative as preserved in source data — potentially incomplete

/NO APPROVED DEMOLITION PLAN.@9STORY NB SITE OBSERVE 9TH FL-ROOF STAIR LANDING CONCRETE DEMOLITION+NO TEMP SHORING&I VERIFIED DEMO OPERATIONS NOT ON ANY DEPARTMENT OF BUILDING STAMPED PLAN IN RECORDS&PROVIDED D

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
July 13, 2026
Service date
July 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop, stairs or landings. Record-specific inspection detail: Inspector text begins: “/NO APPROVED DEMOLITION PLAN.@9STORY NB SITE OBSERVE 9TH FL-ROOF STAIR LANDING CONCRETE DEMOLITION+NO TEMP SHORING&I VERIFIED DEMO OPERATIONS NOT ON ANY DE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039556531X.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • stair/landing measurements and dated photos or approved egress plans
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039556531X, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 25-08 43 Avenue, Queens, NY 11101
Summons 6 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39559075P

Normalized ten-character lookup: 039559075P (infraction 263)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION,GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOL

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
September 11, 2026
Service date
October 1, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 25-08 43 Avenue, Queens, NY 11101

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION,GENERAL CONTRAC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559075P.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559075P, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 25-08 43 Avenue, Queens, NY 11101
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 25-08 43 Avenue, Queens, NY 11101 — not just the summons number

For this property, start with site safety / construction operations and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Elevator / hoist compliance (1 source summons): Elevator/hoist hearing response and device-record coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 1, 2026, December 8, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.