Stop-work order / continued work — ECB/OATH summons 39200820P
Normalized ten-character lookup: 039200820P (infraction 263)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #35655900K ISSUED ON 07-28-2022 FOR UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER., FILE A CERTIFICATE OF CORRECTION
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
- Issue date
- August 17, 2026
- Service date
- August 17, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 25 West 35 Street, Manhattan, NY 10001
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #35655900K ISSUED ON 07-28-2022 FOR UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200820P.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200820P, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Request help with stop-work order / continued work at 25 West 35 Street, Manhattan, NY 10001